They inaugurated a road connection work in Escobar with an investment of $1,161 million

They inaugurated a road connection work in Escobar with an investment of $1,161 million

The brand new road works in Escobar

WATCH VIDEO

The Chief of Staff, Juan Manzur, and the Minister of Public Works, Gabriel Katopodis, inaugurated this Thursday in the Buenos Aires town of Escobar a road connection work that required an investment of $1,161 million.

The work consisted of paving 1,700 linear meters on Los Tulipanes street, in the Lambertuchi neighborhood of Belén de Escobar, from Inmigrantes Avenue to Route 25, to complement the comprehensive resurfacing and improvement work being carried out on that provincial route.

Manzur and Katopodis shared the opening ceremony with the mayor of Escobar on leave and president of the National Entity for the Control and Management of the Waterway, Ariel Sujarchuk; the interim mayor Alberto Ramil; and the Minister of Infrastructure and Public Services of the province of Buenos Aires, Leonardo Nardini.

Sujarchuk pondered the promotion of public works by the Government of President Alberto Fernández, and assured that 2021 “is going to be the year of greatest investment in infrastructure in Escobar’s history”, despite having weathered the “headwind” that the coronavirus pandemic represented in 2020.

In this context, he differentiated the management of Governor Axel Kicillof from that of his predecessor, María Eugenia Vidal, by pointing out that on this occasion “It was decided to do what the former governor left in the middle.”

For his part, Katopodis remarked that “the economy has already started with works that each neighbor and each neighbor can feel in their daily lives, such as the Avenida De Los Inmigrantes that we have already paved and the works on Los Tulipanes Street, which provide greater connectivity and development for neighborhoods in Escobar”.

The project included the renovation of the pavement along 13,300 square meters and a roadway with an integral curb to improve all circulation and connectivity in this main access, where the North Fruit and Vegetable Market and the Escobar Market operate, next to the Bolivian Community Shopping Center.

Part of the inaugurated route that will speed up traffic in Escobar.

With this new intervention, it is possible to form a circulation ring for heavy traffic in a strategic commercial area of ​​the district, decompressing traffic and generating better circulation in the Lambertuchi, Villa María and Santa María neighborhoods, and thus also safeguard the infrastructure of the whole area. The works included the hydraulic work of about 400 meters of pipe, which were linked to the existing one on Callao street.

With the work carried out on Los Inmigrantes avenue, the hydraulic sanitation of the streets is resolved directly and the pluvial runoff of the sub-basin in the vicinity of the layout and the San Francisco stream.

The Minister of Public Works Gabriel Katopodis, the Chief of Staff Juan Manzur and the Mayor on leave Ariel Sujarchuk
The Minister of Public Works, Gabriel Katopodis, the Chief of Staff, Juan Manzur, and the Mayor on leave, Ariel Sujarchuk.

What’s more, Katopodis and Sujarchuk visited the construction site of the Primary Health Care Center (CAPS), Juana Azurduy, in the Lambertuchi neighborhood, which includes a 300-square-meter building covered with an entrance for guards, a sector for primary care and a vaccination center, as well as medical offices.

The works, which belong to the Plan Argentina Hace, will generate local employment and will strengthen the health infrastructure for thousands of residents of the area who must travel more than 2 kilometers to reach the nearest hospital.

The officials receive the affection of the neighbors
The officials receive the affection of the neighbors.

“In each locality there is an investment of the National State in works that are for the generation of employment and the growth of the communities,” said Minister Katopodis.

In Escobar, the Ministry of Public Works carries out works that include road works, water and sanitation, flood control, urban improvement, social equipment and sanitary infrastructure

There are currently 3,060 works underway throughout the country that include the management of all areas of the Ministry, its agencies and dependent companies; In addition, a total of 1,505 projects are in the process of evaluation and approval.



Source link

Leave a Reply

Previous Story

Exporters lose up to $300,000 a day due to trucks stopped at the border with Chile

Next Story

Tico union asks to vote for social fighters in elections

Latest from Argentina