The Darío Sainger Lopez company was awarded by G. 154,638,000
During the afternoon, the DNCP published that the company Darío Sainger Lopez was awarded for a total value of G. 154,638,000, it managed to win the tender for Construction of Paving Stone With Cordon Cuneta in Alborada Section 1 and 2 with ID 398,776. For said tender, offers began to be received on Friday, July 2, 2021.
Municipality of San Rafael del Paraná was the institution in charge of carrying out the Call for Bids No. 398,776 under the category of Construction, Restoration, Reconstruction or Remodeling and Repair of Real Estate, by the type of Direct Contracting procedure.
The aforementioned institution awarded 26 items.
General Cleaning of the Construction Site. by G. 420,000.
Layout and Marking of Work, With Topographic Equipment. by G. 756,000.
Work Poster (Wooden Structure and Sheet No. 24) 2.00 X 1.50 M, With Printing on Vinyl Canvas). by G. 885,000.
Sheet Metal Signs 24. (0.30 X 0.80). by G. 612,000.
Soil Movement (Profiling) and Cash Preparation.- for G. 2,114,000.
Mechanical Soil Compaction. by G. 2,877,600.
Clean Colored Earth Mattress for Stone Seat (Th. 0.20 M). by G. 5,808,000.
Pavement Type Cobblestone, Raw Stone (Minimum Thickness 0.15 M) .- by G. 41,580,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.10 M. – Loaded In Situ.- by G. 16,000,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.20 M. – Loaded In Situ.- by G. 487.200.
Graded With 6th Grade Crushed Stone, On Cobblestone Pavement. by G. 2,587,200.
Initial, Daily and Final Compaction by G. 2,772,000.
General and Final Cleaning of the Construction Site. by G. 420,000.
General Cleaning of the Construction Site. by G. 420,000.
Layout and Marking of Work, With Topographic Equipment. by G. 756,000.
Work Poster (Wooden Structure and Sheet No. 24) 2.00 X 1.50 M, With Printing on Vinyl Canvas). by G. 885,000.
Sheet Metal Signs 24. (0.30 X 0.80) .- for G. 612,000.
Soil Movement (Profiling) and Box Preparation. by G. 2,114,000.
Mechanical Soil Compaction. by G. 2,877,600.
Clean Colored Earth Mattress for Stone Seat (Th. 0.20 M). by G. 5,808,000.
Pavement Type Cobblestone, Raw Stone (Minimum Thickness 0.15 M). by G. 41,580,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.10 M. – Loaded In Situ.- by G. 16,000,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.20 M. – Loaded In Situ. by G. 487.200.
Graded With 6th Grade Crushed Stone, On Cobblestone Pavement. by G. 2,587,200.
Initial, Daily and Final Compaction by G. 2,772,000.
General and Final Cleaning of the Construction Site. by G. 420,000.
The aforementioned firm’s legal representative is Darío Sainger López.
Two more companies appeared at the call: Dalaras SA and Roberto Carlos Ferreira Sosa.
Child died from malnutrition in La Guajira. Photo: video capture Noticias Caracol. The minor’s parents crossed streams and traveled a long distance in search of help to save their little son, who,
Starring in the spin-off of the John Wick saga might not be enough to shake off all the shit that has just been thrown at him The post Ana de Armas: Sleeping
“These funds have been suspended by court orders since 2018-2019,” warns the director of the Association of Circuit Magistrates and District Judges of the Judicial Branch of the AC Federation (JUFED), Juana
The magistrate Roberto Burneo He will be sworn in TODAY as the new president of the National Election Jury (JNE) for the period 2024-2028, and in this way he will replace Jorge
Santo Domingo. – 40% of the work accidents They are en route, and of that percentage, 63% occur aboard motorcycles. This was reported by the executive director of the Dominican Institute for