The Darío Sainger Lopez company was awarded by G. 154,638,000
During the afternoon, the DNCP published that the company Darío Sainger Lopez was awarded for a total value of G. 154,638,000, it managed to win the tender for Construction of Paving Stone With Cordon Cuneta in Alborada Section 1 and 2 with ID 398,776. For said tender, offers began to be received on Friday, July 2, 2021.
Municipality of San Rafael del Paraná was the institution in charge of carrying out the Call for Bids No. 398,776 under the category of Construction, Restoration, Reconstruction or Remodeling and Repair of Real Estate, by the type of Direct Contracting procedure.
The aforementioned institution awarded 26 items.
General Cleaning of the Construction Site. by G. 420,000.
Layout and Marking of Work, With Topographic Equipment. by G. 756,000.
Work Poster (Wooden Structure and Sheet No. 24) 2.00 X 1.50 M, With Printing on Vinyl Canvas). by G. 885,000.
Sheet Metal Signs 24. (0.30 X 0.80). by G. 612,000.
Soil Movement (Profiling) and Cash Preparation.- for G. 2,114,000.
Mechanical Soil Compaction. by G. 2,877,600.
Clean Colored Earth Mattress for Stone Seat (Th. 0.20 M). by G. 5,808,000.
Pavement Type Cobblestone, Raw Stone (Minimum Thickness 0.15 M) .- by G. 41,580,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.10 M. – Loaded In Situ.- by G. 16,000,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.20 M. – Loaded In Situ.- by G. 487.200.
Graded With 6th Grade Crushed Stone, On Cobblestone Pavement. by G. 2,587,200.
Initial, Daily and Final Compaction by G. 2,772,000.
General and Final Cleaning of the Construction Site. by G. 420,000.
General Cleaning of the Construction Site. by G. 420,000.
Layout and Marking of Work, With Topographic Equipment. by G. 756,000.
Work Poster (Wooden Structure and Sheet No. 24) 2.00 X 1.50 M, With Printing on Vinyl Canvas). by G. 885,000.
Sheet Metal Signs 24. (0.30 X 0.80) .- for G. 612,000.
Soil Movement (Profiling) and Box Preparation. by G. 2,114,000.
Mechanical Soil Compaction. by G. 2,877,600.
Clean Colored Earth Mattress for Stone Seat (Th. 0.20 M). by G. 5,808,000.
Pavement Type Cobblestone, Raw Stone (Minimum Thickness 0.15 M). by G. 41,580,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.10 M. – Loaded In Situ.- by G. 16,000,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.20 M. – Loaded In Situ. by G. 487.200.
Graded With 6th Grade Crushed Stone, On Cobblestone Pavement. by G. 2,587,200.
Initial, Daily and Final Compaction by G. 2,772,000.
General and Final Cleaning of the Construction Site. by G. 420,000.
The aforementioned firm’s legal representative is Darío Sainger López.
Two more companies appeared at the call: Dalaras SA and Roberto Carlos Ferreira Sosa.
After the Minister of Economy and Finance (MEF), Denisse Miralles, assured that since Petroperu There is no information about the real situation of the company, changes were made in the presidency of
At the facilities of the National Anti-Drug Command, an important meeting was held with representatives of the Anti-Drug Task Force, where the statistical advances achieved to date in the year 2025 were
Companies and micro-entrepreneurs that issue invoices gained more time to adapt to tax reform. The Federal Revenue Service and the Goods and Services Tax Management Committee (CGIBS) decided not to apply fines
If you want to start the year with work, this is your opportunity. Find out about the vacancies available in Bogotá and how to apply for them! If you are one of
Spain had already established honorary consular presence in Camagüey since 1999. MIAMI, United States. – The Spanish Government approved this Tuesday the creation of a consulate general in Camagüey to expand the