The Darío Sainger Lopez company was awarded by G. 154,638,000
During the afternoon, the DNCP published that the company Darío Sainger Lopez was awarded for a total value of G. 154,638,000, it managed to win the tender for Construction of Paving Stone With Cordon Cuneta in Alborada Section 1 and 2 with ID 398,776. For said tender, offers began to be received on Friday, July 2, 2021.
Municipality of San Rafael del Paraná was the institution in charge of carrying out the Call for Bids No. 398,776 under the category of Construction, Restoration, Reconstruction or Remodeling and Repair of Real Estate, by the type of Direct Contracting procedure.
The aforementioned institution awarded 26 items.
General Cleaning of the Construction Site. by G. 420,000.
Layout and Marking of Work, With Topographic Equipment. by G. 756,000.
Work Poster (Wooden Structure and Sheet No. 24) 2.00 X 1.50 M, With Printing on Vinyl Canvas). by G. 885,000.
Sheet Metal Signs 24. (0.30 X 0.80). by G. 612,000.
Soil Movement (Profiling) and Cash Preparation.- for G. 2,114,000.
Mechanical Soil Compaction. by G. 2,877,600.
Clean Colored Earth Mattress for Stone Seat (Th. 0.20 M). by G. 5,808,000.
Pavement Type Cobblestone, Raw Stone (Minimum Thickness 0.15 M) .- by G. 41,580,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.10 M. – Loaded In Situ.- by G. 16,000,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.20 M. – Loaded In Situ.- by G. 487.200.
Graded With 6th Grade Crushed Stone, On Cobblestone Pavement. by G. 2,587,200.
Initial, Daily and Final Compaction by G. 2,772,000.
General and Final Cleaning of the Construction Site. by G. 420,000.
General Cleaning of the Construction Site. by G. 420,000.
Layout and Marking of Work, With Topographic Equipment. by G. 756,000.
Work Poster (Wooden Structure and Sheet No. 24) 2.00 X 1.50 M, With Printing on Vinyl Canvas). by G. 885,000.
Sheet Metal Signs 24. (0.30 X 0.80) .- for G. 612,000.
Soil Movement (Profiling) and Box Preparation. by G. 2,114,000.
Mechanical Soil Compaction. by G. 2,877,600.
Clean Colored Earth Mattress for Stone Seat (Th. 0.20 M). by G. 5,808,000.
Pavement Type Cobblestone, Raw Stone (Minimum Thickness 0.15 M). by G. 41,580,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.10 M. – Loaded In Situ.- by G. 16,000,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.20 M. – Loaded In Situ. by G. 487.200.
Graded With 6th Grade Crushed Stone, On Cobblestone Pavement. by G. 2,587,200.
Initial, Daily and Final Compaction by G. 2,772,000.
General and Final Cleaning of the Construction Site. by G. 420,000.
The aforementioned firm’s legal representative is Darío Sainger López.
Two more companies appeared at the call: Dalaras SA and Roberto Carlos Ferreira Sosa.
The program “Final Point” revealed that a married couple illegally served FrigoInca, allegedly in exchange for the figure of S/215 thousand soles, each from their entity. This company is being investigated for
In an analysis of the challenges and opportunities faced by the Dominican Republicthe president of National Council of the Private Company (Conep), Celso Juan Marranziniand its executive vice president, César Dargam, stressed
The Minister of Popular Power for Culture, Ernesto Villegas, stated that “a deliberate attack, framed in a hybrid war strategy,” is underway in Venezuela to undermine the fundamental values of the Nation,
Phoenix, Arizona. The president-elect of the United States, Donald Trump, announced that he will launch a new anti-drug advertising campaign to show the physical impact of using drugs such as fentanyl and
Last Friday, the Constitutional Court decided to annul the effective prison sentence of three years and six months that the Transitory Criminal Appeals Chamber Specialized in Corruption Crimes of Junín imposed on