The Darío Sainger Lopez company was awarded by G. 154,638,000
During the afternoon, the DNCP published that the company Darío Sainger Lopez was awarded for a total value of G. 154,638,000, it managed to win the tender for Construction of Paving Stone With Cordon Cuneta in Alborada Section 1 and 2 with ID 398,776. For said tender, offers began to be received on Friday, July 2, 2021.
Municipality of San Rafael del Paraná was the institution in charge of carrying out the Call for Bids No. 398,776 under the category of Construction, Restoration, Reconstruction or Remodeling and Repair of Real Estate, by the type of Direct Contracting procedure.
The aforementioned institution awarded 26 items.
General Cleaning of the Construction Site. by G. 420,000.
Layout and Marking of Work, With Topographic Equipment. by G. 756,000.
Work Poster (Wooden Structure and Sheet No. 24) 2.00 X 1.50 M, With Printing on Vinyl Canvas). by G. 885,000.
Sheet Metal Signs 24. (0.30 X 0.80). by G. 612,000.
Soil Movement (Profiling) and Cash Preparation.- for G. 2,114,000.
Mechanical Soil Compaction. by G. 2,877,600.
Clean Colored Earth Mattress for Stone Seat (Th. 0.20 M). by G. 5,808,000.
Pavement Type Cobblestone, Raw Stone (Minimum Thickness 0.15 M) .- by G. 41,580,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.10 M. – Loaded In Situ.- by G. 16,000,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.20 M. – Loaded In Situ.- by G. 487.200.
Graded With 6th Grade Crushed Stone, On Cobblestone Pavement. by G. 2,587,200.
Initial, Daily and Final Compaction by G. 2,772,000.
General and Final Cleaning of the Construction Site. by G. 420,000.
General Cleaning of the Construction Site. by G. 420,000.
Layout and Marking of Work, With Topographic Equipment. by G. 756,000.
Work Poster (Wooden Structure and Sheet No. 24) 2.00 X 1.50 M, With Printing on Vinyl Canvas). by G. 885,000.
Sheet Metal Signs 24. (0.30 X 0.80) .- for G. 612,000.
Soil Movement (Profiling) and Box Preparation. by G. 2,114,000.
Mechanical Soil Compaction. by G. 2,877,600.
Clean Colored Earth Mattress for Stone Seat (Th. 0.20 M). by G. 5,808,000.
Pavement Type Cobblestone, Raw Stone (Minimum Thickness 0.15 M). by G. 41,580,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.10 M. – Loaded In Situ.- by G. 16,000,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.20 M. – Loaded In Situ. by G. 487.200.
Graded With 6th Grade Crushed Stone, On Cobblestone Pavement. by G. 2,587,200.
Initial, Daily and Final Compaction by G. 2,772,000.
General and Final Cleaning of the Construction Site. by G. 420,000.
The aforementioned firm’s legal representative is Darío Sainger López.
Two more companies appeared at the call: Dalaras SA and Roberto Carlos Ferreira Sosa.
For Leo Messithe final of the Cup MLS This Saturday will represent an end. And, quite possibly, a new beginning. Messi and him Inter Miami They will face Thomas Müller, one of
The Joint Parliamentary Commission of Inquiry (CPMI) of the National Social Security Institute (INSS) rejected, by 19 votes against 12this Thursday (4), the opposition request to summon President Luiz Inácio Lula da
The offer is clear: BancoEstado clients can obtain up to 40% discount in pharmacies, an opportunity that becomes a significant relief for the family pocket during the month of festivities. It is
The artist was recently arrested after an accident in Fort Myers, remains in custody at Alligator “Alcatraz” and faces the possibility of being deported. MADRID, Spain.- Cuban musician Leandro Medina Fellové, known
✅ With 85 votes in favor and 36 against, the general and non-reserved articles of the minutes that create the General Water Law and reform the National Water Law are approved. —