Of the 861 gigawatt-hours (GWh) that were consumed last month, 484 were from wind power (53.8%), hydro 301 GWh (33.5%), biomass 72 GWh (8%), solar 42 GWh ( 4.6%), thermal 0.5% GWh (0.06%).
In 2000, the first experimental wind turbine was installed in the Sierra de los Caracoles, and in 2007 the first commercial wind turbine was installed in Maldonado. Uruguay has a total of 43 wind farms that generate energy.
The Uruguayan Association of Private Generators of Uruguay (AUGPEE) has estimated that the savings in the electrical system from the incorporation of renewable sources such as wind and solar power is more than 744 million dollars in the period 2007-2019.
Almost 55% of the energy consumed in October was from windmills
Latest from Blog
Carla Zambelli resigns from her mandate; Chamber will swear in the substitute
The Chamber of Deputies reported this Sunday (14) that deputy Carla Zambelli (PL-SP) resigned from her mandate. The communication was sent to the Board of Directors of the House. With the resignation,
Terrorist attack leaves 12 dead in Australia
At least 12 people died and 29 were injured this Sunday during a shooting on Bondi Beach in Sydney, Australia. The incident was declared a “terrorist attack” by the local government. The
Cuba’s food dependence on the US grows with purchases of 355 million dollars this year
Havana/The food sovereignty and the United States embargo, mantras that the Cuban authorities repeat every day, have been dismantled, even more, so far this year. During the first nine months of 2025,
More than 18,400 disadvantaged people access education through LearnINEA: Mario Delgado
With this digital educational tool, we contribute to the principle established by President Claudia Sheinbaum Pardo of guaranteeing access to education for all Mexicans, he highlighted. Through the cell phone, computer or
Farmers in Arequipa demand that José Jerí stop Southern operations in Valle Tambo
The farmers of Cocachacra, Bonbon Tip and other districts of Tambo Valleyin Arequipathey demand from the president José Jerí order to stop the company’s operations Southern mining in her Tía María project.
