The Darío Sainger Lopez company was awarded by G. 154,638,000
During the afternoon, the DNCP published that the company Darío Sainger Lopez was awarded for a total value of G. 154,638,000, it managed to win the tender for Construction of Paving Stone With Cordon Cuneta in Alborada Section 1 and 2 with ID 398,776. For said tender, offers began to be received on Friday, July 2, 2021.
Municipality of San Rafael del Paraná was the institution in charge of carrying out the Call for Bids No. 398,776 under the category of Construction, Restoration, Reconstruction or Remodeling and Repair of Real Estate, by the type of Direct Contracting procedure.
The aforementioned institution awarded 26 items.
General Cleaning of the Construction Site. by G. 420,000.
Layout and Marking of Work, With Topographic Equipment. by G. 756,000.
Work Poster (Wooden Structure and Sheet No. 24) 2.00 X 1.50 M, With Printing on Vinyl Canvas). by G. 885,000.
Sheet Metal Signs 24. (0.30 X 0.80). by G. 612,000.
Soil Movement (Profiling) and Cash Preparation.- for G. 2,114,000.
Mechanical Soil Compaction. by G. 2,877,600.
Clean Colored Earth Mattress for Stone Seat (Th. 0.20 M). by G. 5,808,000.
Pavement Type Cobblestone, Raw Stone (Minimum Thickness 0.15 M) .- by G. 41,580,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.10 M. – Loaded In Situ.- by G. 16,000,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.20 M. – Loaded In Situ.- by G. 487.200.
Graded With 6th Grade Crushed Stone, On Cobblestone Pavement. by G. 2,587,200.
Initial, Daily and Final Compaction by G. 2,772,000.
General and Final Cleaning of the Construction Site. by G. 420,000.
General Cleaning of the Construction Site. by G. 420,000.
Layout and Marking of Work, With Topographic Equipment. by G. 756,000.
Work Poster (Wooden Structure and Sheet No. 24) 2.00 X 1.50 M, With Printing on Vinyl Canvas). by G. 885,000.
Sheet Metal Signs 24. (0.30 X 0.80) .- for G. 612,000.
Soil Movement (Profiling) and Box Preparation. by G. 2,114,000.
Mechanical Soil Compaction. by G. 2,877,600.
Clean Colored Earth Mattress for Stone Seat (Th. 0.20 M). by G. 5,808,000.
Pavement Type Cobblestone, Raw Stone (Minimum Thickness 0.15 M). by G. 41,580,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.10 M. – Loaded In Situ.- by G. 16,000,000.
Cordon Escondido de Hº. Development0.30 M. Thickness 0.20 M. – Loaded In Situ. by G. 487.200.
Graded With 6th Grade Crushed Stone, On Cobblestone Pavement. by G. 2,587,200.
Initial, Daily and Final Compaction by G. 2,772,000.
General and Final Cleaning of the Construction Site. by G. 420,000.
The aforementioned firm’s legal representative is Darío Sainger López.
Two more companies appeared at the call: Dalaras SA and Roberto Carlos Ferreira Sosa.
The Minister of Health, César Vásquez, minimized the strike carried out by doctors and health workers, who demand a minimum increase of 10% in the budget allocated to that sector by 2025.
The Ministry of Defense asked the Director of Immigration, Vice Admiral Luis Rafael Leer Ballester, to strengthen immigration control measures to prevent Dominican military personnel from leaving the country through ports and
//t.co/owAC4rDIQwMR. CITIZEN: Yes, we will be different with the FAPIT. Do you agree with the terrorist groups Hamas and Hezbolla that have the Western Judeo-Christian world under fire? VOTE PEACE. — Graciela
Sociologists, psychiatrists, anthropologists and psychologists will deliver a report to the Constitutional Chamber on the effects of this type of challenges on the behavior of boys, girls and adolescents The Constitutional Chamber
After being indicted by the Federal Police (PF), former president Jair Bolsonaro published on his account on the social network X, this Thursday (21), excerpts from his interview with the Metrópoles news