The company Constructora Isacio Vallejos SA was awarded by G. 39,533,343,034
In the course of the afternoon, the DNCP published that the Constructora Isacio Vallejos SA company was awarded for a total value of G. 39,533,343,034, and managed to win the tender called Mopc No. 98/2021 International Public Tender for Specialized Road Construction Companies for Construction of the Curuguaty City Beltway. ID 402,398 with the ID 402,398. For this tender, offers began to be received on Friday, November 26, 2021.
The Ministry of Public Works and Communications (MOPC) was the institution in charge of carrying out the Call for Tenders No. 402,398 under the category of Construction, Restoration, Reconstruction OR Remodeling and Repair of Real Estateby the type of International Public Bidding procedure.
The aforementioned institution awarded 49 items.
Clearing, clearing and clearing by G. 183.984.992.
Excavation Not Classified by G. 1,197,141,375.
Excavation of Bolsones by G. 173.629.221.
Excavation of Drainage Trenches by G. 120.415.778.
Embankment by G. 7,577,927,734.
Structural Excavation by G. 28,757,055.
Subgrade Improved Cbr 15% by G. 1,102,198,760.
Primer Irrigation by G. 886.073.436.
League irrigation for G. 277,501,730.
Sub Base Cemented Rc7
Granular Base Cbr 100 by G. 3.483.789.062.
Asphaltic Concrete Folder in Bench by G. 1.943.679.231.
Hot Asphaltic Concrete (Polymer) Folder by G. 5.214.212.565.
Stone Pavement Type (Starts) by G. 89.524.890.
Simple Tubular Culvert D= 0.80 M by G. 156.164.030.
Simple Tubular Culvert D= 1.00 M by G. 32.575.641.
Simple Tubular Culvert D= 1.20 M by G. 110.708.914.
Double Tubular Culvert D= 0.80 M by G. 120.062.391.
Tiple Tubular Culvert D= 1.20 M by G. 224.607.896.
Simple Cellular Culvert of H°A° 1.50X1.50M by G. 115.498.994.
Simple Cellular Culvert of H°A° 3.00X3.00M by G. 355.582.907.
Double Cellular Culvert of H°A° 1.50X1.50M by G. 180.342.542.
Double Cellular Culvert of H°A° 2.00X2.00M by G. 240.779.886.
Triple Cellular Culvert of H°A° 1.50X1.50M by G. 861.716.137.
Vertical signage by G. 214.330.969.
Horizontal signage by G. 179.843.567.
Metal Railing for Vehicle Containment by G. 2.603.952.236.
Bidirectional studs by G. 71.245.219.
Cordon Gutter by G. 46.871.585.
Milestones by G. 14,012,488.
Bound by G. 134.376.364.
Transfer of Public Service Structures by G. 11.199.380.
Wiring Construction by G. 348.735.670.
Signaling Gate by G. 237.009.916.
Concrete Lined Ditch by G. 208.792.448.
Concrete Sinks by G. 800.942.218.
Descent Gutter by G. 13,114,872.
Concrete Cord by G. 17.723.808.
Collection Boxes Ats0.80 per G. 18,034,440.
Collection Boxes Act1.50X1.50 by G. 29,305,965.
Dissipative harrows by G. 102.647.822.
Canalization of Raw Stone Wall by G. 606.903.992.
Docks and Booths for Passenger Refuge by G. 25.445.822.
Protection of Loan Areas by G. 272.995.155.
Lighting With Artifacts by G. 345.356.973.
Installation and Specialized Services by G. 452.389.524.
Mobilization by G. 791.909.386.
Socio-Environmental Management Plan Pga for G. 393,846,638.
Compensation for Property for G. 3,500,000,000.
The aforementioned firm’s legal representative is Isacio Eusebio Vallejos Aquino and Claudia Eliana Vallejos Acosta.
The call was presented by 7 more companies:
Benito Roggio and Sons S.A.
Dc Engineering S.A.
Meyan SA
Ramón C. Alvarez Limited Company – Paraguay Branch
When this year ends, the Dominican state will have added more than 4,000 million dollars to the amount of what it owed at the beginning of 2025, raising the total of its
Oil tanker seized by the United States off the coast of Venezuela. Photo: EFE After the seizure of two oil tankers in Venezuelan waters by the United States, the debate on the
Minister Alexandre de Moraes, of the Federal Supreme Court (STF), ordered this Friday afternoon (26) the preventive detention of Silvinei Vasques, former director of the Federal Highway Police (PRF) during the government
The operation, announced by Donald Trump, was carried out in coordination with the Nigerian government and targeted positions of the jihadist group in the northwest of the country. Cubanet December 26, 2025
Tras un sexenio de votos disciplinados en el Congreso, el 2025 marcó el distanciamiento legislativo del Partido del Trabajo (PT) con Morena. Aunque la dirigencia petista advierte que no hay ni habrá