The company Alejandro Raul Perez Heras was awarded for G. 1,372,999,992
During the afternoon, the DNCP published that the company Alejandro Raul Perez Heras was awarded for a total value of G. 1,372,999,992, managed to win the N Sbe tender No. 29/2022 Conditioning of Open Areas in the Snd in the Framework of the Xii South American Games Asunción with the ID 407.899. For this tender, offers began to be received on Friday, June 10, 2022.
National Sports Secretariat (SND) was the institution in charge of carrying out the Call for Tenders No. 407,899 under the category of Construction, Restoration, Reconstruction OR Remodeling and Repair of Real Estateby the type of National Public Bidding procedure.
The aforementioned institution awarded 26 items.
Plaza de Las Banderas – Preliminary Works by G. 43.159.830.
Plaza de Las Banderas – Civil Works by G. 238.256.289.
Plaza de Las Banderas – General Facilities by G. 35,500,358.
Plaza de Las Banderas – Gardening by G. 48.035.639.
Plaza de Las Banderas – Urban Furniture by G. 65.105.125.
Plaza de Las Banderas – Final Cleaning of Work by G. 1,619,730.
Outdoor Gym 1 East Block – Civil Works by G. 2.815.308.
Outdoor Gym 1 East Block – Final Cleaning of Work by G. 1.075.680.
Outdoor Gym 2 Table Tennis Area – Preliminary Works by G. 13.357.608.
Outdoor Gym 2 Table Tennis Area – Civil Works by G. 112.865.663.
Outdoor Gym 2 Table Tennis Area – General Facilities by G. 2,887,574.
Outdoor Gym 2 Table Tennis Area – Final Cleaning of Work by G. 5.458.610.
Pedestrian Access and Vehicle Layout – Civil Works Removal by G. 6,087,910.
Pedestrian Access and Vehicle Layout – Civil Works Construction by G. 174.225.892.
Pedestrian Access and Vehicular Route – Vehicular Circulation by G. 235.326.271.
Pedestrian Access and Vehicle Layout – Urban Furniture by G. 34.306.340.
Pedestrian Access and Vehicle Layout – Cordon Painting by G. 38.920.500.
Snd Complex Federations (East Block) – Preliminary Works by G. 528.303.
Snd Complex Federations (East Block) – Civil Works by G. 97.448.247.
Snd Complex Federations (East Block) – Final Cleaning of Work by G. 2.033.154.
Snd Parque Infantil – Preliminary Works by G. 8.668.159.
Snd Parque Infantil – Civil Works Construction by G. 200.509.786.
Snd Children’s Park – Final Cleaning of Work by G. 3,017,230.
Snd Entrance Hotel Deportista Roga – Preliminary Works by G. 197.070.
Snd Entrance Hotel Deportista Roga – Civil Works for G. 653.775.
Snd Entrance Hotel Deportista Roga – Final Cleaning of Work by G. 939.941.
The aforementioned firm’s legal representative is Ing Alejandro Raul Perez Heras.
One more company came to the call: Antonio Rafael Cabrera Burgos.
The Ministry of Health signed an unprecedented agreement to expand the actions of the Agora Tem Especialistas program in Rio Grande Sul. Grupo Hospitalar Conceição (GHC), a public company linked to the
Unit 8 of the Máximo Gómez thermoelectric plant left the system this morning due to “turbine instrumentation problems.” LIMA, Peru – The Electrical Union (UNE) predicted for December 20 that simultaneous blackouts
The Federal Civil Aviation Agency opened an administrative investigation into the incident that occurred on a Magnicharters flight to Cancun, after a pilot stopped the operation of the aircraft after being notified
The mayor of Carabayllo, Pablo Mendoza, was the victim of an assassination attempt by some individuals who shot during the inauguration of works in the district. News in development… Source link
Secretary Kristi Noem indicated that the seizure of the second oil tanker occurred “before dawn” on Saturday, December 20, in an operation by the US Coast Guard and that it had the