Diego Armando Mercado Britez was awarded for G. 491,168,000
In the course of the morning, the DNCP published that Diego Armando Mercado Britez was awarded for a total value of G. 491,168,000, managed to win the Bridge Construction tender in Colonia San Isidro de los Cedrales-Plurianual 2023 with the ID 419,310. For this tender, offers began to be received on Tuesday, October 25, 2022.
Departmental Government of Alto Paraná (A.PARANÁ) was the institution in charge of carrying out the Call for Tenders No. 419,310 under the category of Construction, Restoration, Reconstruction OR Remodeling and Repair of Real Estateby the type of Bid Contest procedure.
The aforementioned institution awarded 18 items.
Metal Poster With Support – Construction Poster for G. 3,000,000.
Work Preparation – Layout and Marking by G. 1,224,000.
Work Preparation – Installation of the Work for G. 14,000,000.
Installation of Electrical Energy Devices – Electrical Installation and Driving Force for G. 9,000,000.
Work Preparation – Soil Movement, Terrain Preparation and Compaction Prior to Backfilling for G. 5,500,000.
Work Preparation – Filling and Compaction Before the Wall on Both Sides for G. 37,000,000.
Placement of Reinforced Concrete – Cyclopean Concrete Base (1:3:6 + 30% Pb Placed) for G. 51,250,000.
Work Preparation – Stone Wall Seen From One Side by G. 9,184,000.
Placement of Reinforced Concrete – Main Deck Reinforced Concrete Slabs for G. 78,650,000.
Placement of Reinforced Concrete – Main Support Beams of Ho. Oh. (Longitudinal and Transversal) by G. 91,300,000.
Placement of Reinforced Concrete – Bridge Abutments and Foundation for G. 96,000,000.
Placement of Reinforced Concrete -Concrete Pillars for G. 28,800,000.
Placement of Reinforced Concrete – Concrete Cloth for Retaining Wall for G. 19,000,000.
Placement of Reinforced Concrete – Approach Slabs and Cantilever of the Bridge. for G. 34,080,000.
Placement of Reinforced Concrete – Railing of Reinforced Concrete for G. 6,480,000.
Construction of Bridge / Viaduct – Expansion Joints for G. 1,500,000.
Drainage Systems Construction Service – Relief Drains for G. 1,200,000.
General Construction Cleaning Service – Final Work Cleaning for G. 4,000,000.
The aforementioned firm has Diego Armando Mercado Britez as its legal representative.
Two more companies responded to the call: Industrial Alto Parana SA and Megga Imp.Exp. Anonymous society.
Last Saturday, Japanese Prime Minister Shigeru Ishiba visited the grave of former President Alberto Fujimori, who died in September. Ishiba left him flowers and prayed for his rest. As is known, Ishiba
Santo Domingo.- The Vice President of the Republic, Raquel Peña, together with the Minister of Public Works, Deligne Ascención, led this Sunday the inaugural act of paving 82 streets in the Cachón
Yamandú Orsi arrived on set The candidate for the Frente Amplio, Yamandú Orsi, spoke little in front of the press, in the minutes before the debate, friendly but distant with the journalists.
The Penal Forum reported that it has verified the release of 131 political prisoners, detained in the framework of the protests after the presidential elections of July 28 This Sunday, November 17,
President Luiz Inácio Lula da Silva met, this Sunday (17), in Rio de Janeiro, with the president of South Africa, Cyril Ramaphosa, who will assume the presidency of the G20 after the