Home South AmericaBolivia After several hours of blockades, routes in the central axis of Bolivia are open

After several hours of blockades, routes in the central axis of Bolivia are open

by Editor
0 comment
After several hours of blockades, routes in the central axis of Bolivia are open

May 20, 2024, 10:40 PM

May 20, 2024, 10:40 PM

After having started the day with almost a dozen blockades in the country, it closes, At least, with the central axis routes expedited.

According to the report from the Bolivian Highway Administrator (ABC), two blockages were recorded in peace in the Caracollo sector, another point in Senkata and Achica Arriba.

In Santa Cruz A point was installed on the La Amistad Bridge, Guabirá and Portachuelo sectors, by heavy transport drivers in demand of fuel and dollars. While in Warnes, The union members blocked the passage of vehicles on the route that connects Santa Cruz and Huntsman.

All of these were lifted until around 9:00 p.m. this Monday. Some reached an agreement, like in La Paz. Others under the promise of attention to their demands, as in Santa Cruz. Only Beni’s is pending.

In this last department, there is still an indefinite block in the Puente San Pablo sector, departmental limit with Santa Cruz – Beni, led by the Federation of Agricultural Producers that require the construction of a pump, fuel supply, social projects, storage of rice and corn, among other demands.

Source link

You may also like

All the news from Latin America for English speakers

Latest Articles