The company Leopoldo Benitez Bareiro was awarded for G. 137,152,785
During the morning, the DNCP published that the company Leopoldo Benitez Bareiro was awarded for a total value of G. 137,152,785, and managed to win the tender for ° 97/2021, Repair of Block Sshh, Esc. Bas. N° 3785 Friendship and Classroom Repair, Esc. Bas. N° 3783 Dionicio Valiente, from the City of Luque with ID 402.198. For this tender, offers began to be received on Thursday, October 14, 2021.
Municipality of Luque was the institution in charge of carrying out the Call for Tenders No. 402,198 under the category of Construction, Restoration, Reconstruction OR Remodeling and Repair of Real Estateby the type of Direct Contracting procedure.
The aforementioned institution awarded 51 items.
Work Preparation by G. 2,841,060.
Preliminary Works by G. 1,470,955.
Sanitary Area Repairs by G. 4,220,642.
Openings by G. 3,190,815.
Floor by G. 3,266,032.
Revokes by G. 668.520.
Coating by G. 4,156,602.
Painting by G. 1,899,028.
Electrical Installation by G. 248.784.
Preliminary Works by G. 1,404,062.
Sanitary Area Repairs by G. 3,740,767.
Openings by G. 3,190,815.
Floor by G. 3,366,305.
Revoked by G. 710.909.
Coating by G. 6,516,550.
Painting by G. 2,046,720.
Electrical Installation by G. 248.784.
Roof by G. 9,269,291.
Preliminary Works by G. 832.399.
Sanitary Area Repairs by G. 2,071,405.
Openings by G. 2,073,821.
Floors by G. 4,303,761.
Revokes by G. 327.080.
Painting by G. 2,052,954.
Electrical Installation by G. 606.706.
Preliminary Works by G. 858.820.
Sanitary Area Repairs for G. 3,224,600.
Openings by G. 1,909,800.
Floor by G. 3,576,406.
Revokes for G. 598,000.
Painting by G. 1,443,183.
Electrical installation for G. 606,000.
Preliminary Works (Exterior Area) by G. 197.090.
Floor by G. 4,040,440.
Revoked by G. 1,917,300.
Painting by G. 5,050,670.
Handwashing per G. 840.299.
Electrical Installation by G. 610.390.
Work cleaning by G. 1,192,320.
Preparation of Work by G. 1,743,924.
Ceiling – Preliminary Works by G. 2,202,567.
Tile Roof, Wood Braces and Beam H°A° by G. 8,563,497.
Floors – Preliminary Works by G. 1.156.658.
Floors by G. 17,432,482.
Canal – Preliminary Works by G. 417.960.
Channel by G. 7,371,263.
Paredes- Preliminary Works by G. 459.647.
Masonry Walls by G. 1,383,563.
Painting – Preliminary Works by G. 2.694.031.
Electrical Installation by G. 2,451,756.
Final Cleaning of the Work and Removal of Debris by G. 485.352.
The aforementioned firm has Leopoldo Benitez Bareiro as its legal representative.
Two more companies came to the call: Diego Joaquin Rodríguez Barrios and Tesaka Engineering Sociedad Anónima.
There are still diners in restaurants on Juárez Avenue, there is no longer access to customers, employees wait to be given instructions to lower the curtains 📹: David Santiago pic.twitter.com/3X4TOm6wea — Political
In the last year and a half, the State, through the Police or the Public Ministryhas not only persecuted those who, exercising their right to protest, demonstrated against the government of Dina
Dwellers of Gualey They stated that no authority of the Ministry of Works Public has approached them to discuss the issue of eviction under the 17th bridge that will be intervened by
Images from recent days show boats stranded due to low water levels in the Amazon River, affecting around 7,400 people. Text: RFI/AFP The Amazon River, one of the longest and largest in
There are cities in Chile that are characterized by being a paradise, by having enormous beaches and during the summer, they become the main attraction for tourists. One of those places is