Today: January 23, 2025
January 12, 2023
1 min read

Technical and operational efforts are deepened in SEN facilities

Profundizan esfuerzos técnicos y operativos en instalaciones del SEN

The Sector Vice President of Public Works and Services, G/J Nestor Reverolinformed that technical, operational and security efforts are currently being deepened in all the facilities of the National Electric System (SEN).

From the Antonio José de Sucre Hydroelectric Power Plant in Macagua, located in Bolívar state, the also Minister of Popular Power for Electric Energy expressed: “We continue for the fourth consecutive day with the National Plan of Inspections and Comprehensive Maintenance of the SEN, by instructions of our President of the Republic, Nicolás Maduro”.

He specified that the operating and technical systems of Powerhouses I, II and III were verified to guarantee continuity in power generation.

Together with the workers, the minister evaluated general services such as a dining room, medical care and the workplace.

Finally, he recalled that the Antonio José de Sucre Hydroelectric Power Plant is the first built in the so-called Bajo Caroní.

Source: MPPEE Press

VTV/WIL/YD

Source link

Latest Posts

They celebrated "Buenos Aires Coffee Day" with a tour of historic bars - Télam
Cum at clita latine. Tation nominavi quo id. An est possit adipiscing, error tation qualisque vel te.

Categories

Police officers video and facial identification experts, witnesses in the trial
Previous Story

Police officers video and facial identification experts, witnesses in the trial

WhatsApp Image 2023 01 11 at 5.42.44 PM
Next Story

DR adds 17 cases of cholera without report of deaths

Latest from Blog

Arrested for spanking a teenager

Two Corpoelec workers were arrested

Cicpc agents arrested two Corpoelec employees for their alleged connection with the theft of strategic materials from the aforementioned state company. According to a report, the detainees are identified as Johan José
Go toTop