Gustavo Adolfo Velazquez Martinez was awarded by G. 178,186,510
In the course of the morning, the DNCP published that Gustavo Adolfo Velazquez Martinez was awarded for a total value of G. 178,186,510, and managed to win the Fourth Stage Multipurpose Shed Construction tender with ID 417,657. For this tender, offers began to be received on Monday, September 5, 2022.
Municipality of Yrybucuá was the institution in charge of carrying out the Call for Tenders No. 417,657 under the category of Construction, Restoration, Reconstruction OR Remodeling and Repair of Real Estateby the type of Direct Contracting procedure.
The aforementioned institution awarded 44 items.
Work poster for G. 1,000,000.
Floor of Hºaº Finished Smoothing With Helicopter for G. 83,748,000.
Elevation Masonry of 0.15 (On Superior Chaining) by G. 5,300,400.
Plaster (Masonry and Leveling Wall) by G. 4,802,400.
Extension of Metallic Border. Includes Caño Industrial Structure for G. 8,897,000.
Reinforced Concrete Post 7.5 M High Capacity Double Type T7/200 by G. 11.075.400.
Galvanized Caño Gutter by G. 7,026,000.
Descent of Caño Pvc for G. 1,464,000.
Filling and Compaction With Site Soil Or Washed Sand (For Slope Southwest Side) for G. 5,400,000.
Land Cleaning and Preparation for G. 136,500.
Stakeout by G. 91,800.
Excavation and Loading of Pbc Foundation by G. 983.400.
Linked from Hº toº by G. 1,567,300.
Hºaº beam by G. 335.400.
Leveling Masonry 0.30 Cms per G. 797.500.
Filling and Tamping of Interiors for G. 114,000.
Asphaltic Insulation of Walls by G. 683.090.
Masonry of 0.15 to Revoke for G. 2,419,000.
Masonry of 0.15 Seen to One Side of Common Bricks for G. 3,894,000.
Rods Under Openings 2X8 By Courses 8 (2 Courses) per G. 67,500.
Roof of Tiles and Tejuelones Pressed on Suspenders of Hºaº for G. 5,763,000.
Single Layer Interior and Exterior Wall Plasters C/Hydrophobic (Includes Grouts in Openings) for G. 1,107,000.
Hº de Cascotes subfloor for G. 304,500.
Leveling Folder by G. 304,500.
Ceramic floor by G. 878.700.
Save Baldoson Floor Work 0.40 Cmt by G. 251.520.
Metallic Windows Type Rocker 0.60X0.40 by G. 168.480.
Metal door 0.70X2.10 for G. 2,720,000.
Wooden Door Plate Type (Swing) 0.60X1.50 per G. 2,295,000.
Latex Wall Painting by G. 739.800.
Latex Brick Paint by G. 482.440.
Painting Metallic Openings With Synthetic Paint by G. 104.160.
Painting of Gutters and Downspouts for G. 416,000.
Latex Ceiling Paint (Tejuelon) for G. 425,000.
Double Glazing by G. 66.720.
Covered with Tiles for G. 3,431,000.
Canaletas y Bajadas, Development 33 for G. 1,001,000.
Installation in General for G. 3,217,000.
Electrical Devices for G. 2,651,000.
Running Water-Sewage Drainage-Inspection Camera-Sanitary Appliances Taps and Accessories for G. 6,869,000.
Septic chamber 1.20X2.00 for G. 2,269,000.
Soaking Well for G. 2,116,000.
Mirror by G. 118,000.
Final cleaning for G. 685,000.
The aforementioned firm has Gustavo Adolfo Velazquez Martinez as its legal representative.
Two more companies came to the call: Adalberto Samudio Nuñez and Feliciano Rojas Barrios.
This year in Peru there will be 16 holidaysa figure that is above the 12 in 2020. This situation decreases productivity and increases cost overruns in some businesses, business associations warned. Look:
Santo Domingo.-The electronic passport that the government plans to issue starting in August seeks to provide Dominicans with a document with higher levels of security and at the same time meet the
The Chancellor of the Republic, Iván Gil, held a working meeting this Tuesday with the Russian ambassador, Sergey Mélik-Bagdasárov, with the aim of reviewing and strengthening bilateral relations. Through his Telegram channel,
On Wednesday, January 22, 2025, the quotes of the dollar in Argentina it shows significant differences between the official dollar and the blue dollar, reflecting the persistent exchange gap that characterizes the
Donald Trump will radically change 80 years of American foreign policy; In fact, the entire North American strategy is about to take a very dangerous turn. Beyond his buffoonery and tendency toward