The company Alejandro Raul Perez Heras was awarded for G. 1,372,999,992
During the afternoon, the DNCP published that the company Alejandro Raul Perez Heras was awarded for a total value of G. 1,372,999,992, managed to win the N Sbe tender No. 29/2022 Conditioning of Open Areas in the Snd in the Framework of the Xii South American Games Asunción with the ID 407.899. For this tender, offers began to be received on Friday, June 10, 2022.
National Sports Secretariat (SND) was the institution in charge of carrying out the Call for Tenders No. 407,899 under the category of Construction, Restoration, Reconstruction OR Remodeling and Repair of Real Estateby the type of National Public Bidding procedure.
The aforementioned institution awarded 26 items.
Plaza de Las Banderas – Preliminary Works by G. 43.159.830.
Plaza de Las Banderas – Civil Works by G. 238.256.289.
Plaza de Las Banderas – General Facilities by G. 35,500,358.
Plaza de Las Banderas – Gardening by G. 48.035.639.
Plaza de Las Banderas – Urban Furniture by G. 65.105.125.
Plaza de Las Banderas – Final Cleaning of Work by G. 1,619,730.
Outdoor Gym 1 East Block – Civil Works by G. 2.815.308.
Outdoor Gym 1 East Block – Final Cleaning of Work by G. 1.075.680.
Outdoor Gym 2 Table Tennis Area – Preliminary Works by G. 13.357.608.
Outdoor Gym 2 Table Tennis Area – Civil Works by G. 112.865.663.
Outdoor Gym 2 Table Tennis Area – General Facilities by G. 2,887,574.
Outdoor Gym 2 Table Tennis Area – Final Cleaning of Work by G. 5.458.610.
Pedestrian Access and Vehicle Layout – Civil Works Removal by G. 6,087,910.
Pedestrian Access and Vehicle Layout – Civil Works Construction by G. 174.225.892.
Pedestrian Access and Vehicular Route – Vehicular Circulation by G. 235.326.271.
Pedestrian Access and Vehicle Layout – Urban Furniture by G. 34.306.340.
Pedestrian Access and Vehicle Layout – Cordon Painting by G. 38.920.500.
Snd Complex Federations (East Block) – Preliminary Works by G. 528.303.
Snd Complex Federations (East Block) – Civil Works by G. 97.448.247.
Snd Complex Federations (East Block) – Final Cleaning of Work by G. 2.033.154.
Snd Parque Infantil – Preliminary Works by G. 8.668.159.
Snd Parque Infantil – Civil Works Construction by G. 200.509.786.
Snd Children’s Park – Final Cleaning of Work by G. 3,017,230.
Snd Entrance Hotel Deportista Roga – Preliminary Works by G. 197.070.
Snd Entrance Hotel Deportista Roga – Civil Works for G. 653.775.
Snd Entrance Hotel Deportista Roga – Final Cleaning of Work by G. 939.941.
The aforementioned firm’s legal representative is Ing Alejandro Raul Perez Heras.
One more company came to the call: Antonio Rafael Cabrera Burgos.
Fuvest announced this Friday (17) those approved in the first call of the selection process for admission to the University of São Paulo (USP) through the National High School Exam (Enem). Pre-registration
After four hours of security council, different measures were taken to restore public order. Measures to restore public order. Given the complex public order situation that is registered in Norte de Santander,
Havana/Yuniesky Vasconcelos, head of the Xetid military group – designer of the EnZona electronic payment application and in charge since 2022, together with Etecsa, of the cybersecurity in Cuba – assured this
The IMF highlighted the existence of persistent risks, such as the resurgence of inflation in the United States, deflation in other countries such as China. Source link
Omar Awapara, Secretary General of the Transparency Civil Association, explained the reasons why the current Congress of the Republic is one of the most discredited institutions and with the least approval. “I