Today: December 5, 2025
July 23, 2025
1 min read

With heavy machinery they attend critical point of the Way to the Llano in Esquecá (Meta)

With heavy machinery they attend critical point of the Way to the Llano in Esquecá (Meta)

A large -capacity backhoe was sent to a priority area of the goal, as part of new measures to improve mobility.

The National Government announced the transfer of heavy machinery to the Estaquecá sector, in the Department of Meta, as part of the actions aimed at mitigating the risks on the road to the Llano.

The National Government announced the Transfer of heavy machinery to the Estaquecá sector,in the department of Meta, as part of the actions aimed at mitigating the risks on the road to the plain.

The measure was disclosed after a meeting between the Minister of Transportation, María Fernanda Rojas, and the governor of Meta, Rafaela Cortés Zambrano.

Among the mobilized equipment is an Hyundai 330 ride of caterpillars, which weighs more than 37 tons and has a load capacity of 2.1 cubic meters. This type of machinery is designed to face complex land, such as those that characterize this section of the roadwhere geological instabilities have been reported that affect the mobility and safety of travelers.

Loading …

It may interest you: Prosecutor’s Office rules out, for now, a plan to attempt against Mayor Carlos Fernando Galán

The specific point of intervention in Esquecá has been listed as one of the most critical on the road that connects the Oriental Llanos region with the center of the country.

The arrival of this machine seeks to improve the capacity for response to landslides and other natural events that have hindered traffic in this area.

During the meeting between national and departmental authorities, the Installation of joint technical tables for this Friday. These tables will be made up of representatives of the Ministry of Transportation, the National Institute of Roads (Invías) and the Government of Meta.

Its purpose will be Design solutions to the 38 critical points identified on the roadtwo of which have high levels of risk.

More news: National Federation of Coffee Growers presents a new coffee shopping model to preserve the quality of Colombian grain

With these actions, It is expected to advance in the recovery of one of the most relevant routes for the connection between the East and the center of the countryfrequently affected by adverse geological conditions and climatic phenomena.

Source: Integrated information system

Source link

Latest Posts

They celebrated "Buenos Aires Coffee Day" with a tour of historic bars - Télam
Cum at clita latine. Tation nominavi quo id. An est possit adipiscing, error tation qualisque vel te.

Categories

Raúl Castro y Miguel Díaz-Canel, Cuba
Previous Story

United States: “Cuban corruption, not the outside world, is what frightens money”

Revenue releases this Thursday (24) consultation to the 3rd restitution lot
Next Story

Revenue releases this Thursday (24) consultation to the 3rd restitution lot

Latest from Blog

Go toTop