about the Metro Plan Moves With Youthis Tuesday the Executive Vice President of the Bolivarian Republic of Venezuela Delcy Rodríguez verified the recovery and rehabilitation work of underground transportation.
Said inspection began at the Parque Miranda station on Line 1, where a review of the adaptations of the lighting fixtures, the air conditioning recovery system, repair of the escalators, among other works, was carried out.
The event was attended by the Minister of People’s Power for Transportation, Ramón Velásquez Araguayán, and the president of the Caracas Metro, M/G Juan Carlos Du Boulay.
It should be noted that 3 months have elapsed since the implementation of this Plan, in which the authorities are committed to the recovery, approach to infrastructure, security, art and restoration of sculptures in all stations of the Caracas Metro System.
#OnVideo?| Executive Vice President, @delcyrodriguezv together with the authorities of the transport sector, inspects the recovery works of the Caracas Metro.#TraditionsAndJoys pic.twitter.com/E8KErQRBx9
— VTV CHANNEL 8 (@VTVcanal8) December 28, 2022
VTV/YR/EL