Today: February 8, 2025
February 8, 2025
1 min read

Three offers will compete for the La Dorada project – Chiriguaná

Three offers will compete for the La Dorada project - Chiriguaná

The National Infrastructure Agency (ANI) He received three offers for the granting of the Ferreo La Dorada – Chiriguaná, A public-private partnership project (app) that seeks to reactivate rail transport in Colombia. The structures that presented proposals are Golden Erg Structure, Plural Structure Central Hair Record and Plural Structure Apca TFC.

You can see: Tunnel works end that will allow the UF2 of the Pacific Vía 1

The project provides for the construction, rehabilitation, improvement, maintenance and operation of the 526 -kilometer rail corridor, which connects the municipalities of La Dorada, in Caldas, and Chiriguaná, in Cesar. The ANI established that the concession will last 10 years and will have an estimated investment of $ 3.4 billion pesoscalculated as of December 2023.

The president of the ANI, Francisco Ospina Ramírez, declared that “Today is a historic day for Colombia. We closely close one of the most significant phases in the process that seeks to materialize an ANI association with private companies that demonstrate the greatest capacity and preparation to address this important iron corridor that crosses the center of the country and that will strengthen logistics , by railroad, through the Caribbean Sea. ”

See also: The ‘type’ in transportation updates enter into force

La Dorada – Chiriguaná

ANI

The project includes the execution of 1,480 hydraulic works in order to prevent flood The improvement of the ballast, the tuning of rolling material, the construction of an administrative building, an operational control center, two maintenance workshops and a load transfer center in La Dorada. In addition, a system of signaling, communication and trains control with advanced technology will be implemented.

As reported by the ANI, the process of evaluation of offers and proponents will take place during the next two months. Ospina Ramírez said that “What happened today confirms the confidence of the various interested in the Public-Private Association model and in the tender processes that with rigor and technical vocation, advances the National Infrastructure Agency. During the next two months, the offers and proponent evaluation phase will be advanced in which those that do not meet each and every one of the required requirements will be rejected. For the sake of our country, that the best win. ”

He is also interested: Mintransporte reiterates invitation to participate in the first railway app

Fréreo La Dorada - Chiriguaná

Fréreo La Dorada – Chiriguaná

ANI

As part of the project, the construction of a vehicular and pedestrian bridge over the Sogamoso River in Puerto Wilches is expected, as well as the relocation of two educational institutions, Santo Domingo and San José, in Cimitarra, located within the operational strip of the Férreo Corridor .

The National Government seeks, through this initiative, to strengthen the intermodal transport strategy, integrating the road, airport, river and port modes with the rail network. With this infrastructure, A reduction of up to 20% is expected in load transport costs and optimal conditions in the operation. The contract award hearing is scheduled for April 3, 2025.

Paula Galeano Balaguera
Portfolio journalist

Source link

Latest Posts

They celebrated "Buenos Aires Coffee Day" with a tour of historic bars - Télam
Cum at clita latine. Tation nominavi quo id. An est possit adipiscing, error tation qualisque vel te.

Categories

Rick Scott
Previous Story

Rick Scott takes up the democracy law and asks for “strict sanctions against the regime”

Central Bank reports data leak of 8,000 BTG PIX keys
Next Story

Pix has instability in the early afternoon of Friday

Latest from Blog

Mario Borda, new general manager of Boa

Mario Borda, new general manager of Boa

Mario Rodolfo Borda was possessed this Friday as general manager of the Bolivian state of aviation (BOA), in an act held this Friday in La Paz. The possession was in charge of
Go toTop