The Regional Director of Health of West Panama, Kevin Cedeño, specified that the purchase of the equipment outside the country has already been managed and will take a delivery period related to the duration of the boat and transfer.
The Regional Director of Health for West Panama, Kevin Cedeño, indicated that the purchase of the air conditioning system for the Nicolás A. Solano Hospital in La Chorrera has already been approved.
He specified that the purchase of the equipment outside the country has already been managed and will take a delivery period related to the time that the boat and transfer lasts.
“It will take a period of 3 to 5 months to be installed in the hospital,” Cedeño stressed.
I make it clear that the managed item does not only contemplate the repair of the units but the replacement of the entire air conditioning system.
He mentioned that to correct the current situation, small air conditioners were adapted in specific areas within the facility, however, a permanent solution was required, such as the equipment that is being acquired.