During the morning the DNCP published that the company José Orlando Bordenave Tufari was awarded for a total value of G. 856,668,488, managed to win the tender for the Execution of Civil Works for the Construction of Sheds and Offices of the Directorate of Administration of Materials – Boggiani Headquarters with ID 392.054. For this tender, offers began to be received on Thursday, June 24, 2021.
National Electricity Administration (ANDE) was the institution in charge of carrying out the Call for Bids No. 392,054 under the category of Construction, Restoration, Reconstruction or Remodeling and Repair of Real Estate, by the type of National Public Tender procedure.
The aforementioned institution awarded 100 items.
- Assembly and Removal of Obrador, Including Sanitary and Electrical Installations, Telephone and Information Technology; Furniture and Computer Equipment, and General Equipment for the Sereno. In addition, Classifier Trash, and Metal Container for Major Waste and Passable Areas by G. 33.359.580.
- Tree Trunk Includes Uprooting. by G. 602,800.
- General Layout of Work: Shed To Build. by G. 6,752,000.
- Assembly and Removal of Perimeter Fencing of Work by G. 11,411,100.
- Provision and Placement of Work Posters by G. 2,411,200.
- Demolition and Removal of the Stone Wall by G. 14,467,200.
- Excavation for Foundations by G. 4.153.305.
- Pillar Foundation: Socket of H ° A ° of 1.00Mx1.00Mx1.00M With Shaft of Hº A ° of 0.45Mx0.35M – Variable Height. by G. 93,434,000.
- Provision and Placement of Cross-linked Fe Metal Pillars (10 and 20Mm Smooth Fe Rods) – Pillar Armor Welded To The Profiles and Bolted To The 4 Sides. Anticorrosive Treatment and Final Synthetic Paint. (See Details in Drawings) by G. 35,806,320.
- Construction of Fe G ° N ° 26 Sheet Metal Roof, With Reticulated Metallic Structure (Beams, Belts and Tensioners of 10 and 20Mm Smooth Fe Rods), 20% Slope. Anticorrosive Treatment and Final Synthetic Paint. (See Details in Drawings) by G. 367.897.660.
- Construction of Paved Pavement With Filled Joint. by G. 69,925,000.
- Provision and Placement of Lateral Gutter for Storm Drainage, Sheet No. 24 and Development of 0.70M. by G. 6,630,800.
- Provision and Placement of Pluvial Drainage Downspout in Sheet N ° 24 – 20Cm X 12.50Cm by G. 11,453,200.
- Construction of the Storm Drainage Canal C / Tapa de Hº Aº (New and A Repair) by G. 38,880,600.
- Power From Existing TS To The Projected TS. Final Design of Electrical Inst. by G. 1,808,400.
- Provision and Installation of Ground Javelins with Connection to the Board (Includes Cooperweld Type Welding and 50Mm2 Bare Copper Cable.) By G. 904.200.
- Provision and Installation of Sectional Board With Phase Bar and Neutral, Rail, Tm Keys and Accessories by G. 2.411.200.
- Provision and Installation of Light Mouths (Includes Pipes, Cables, Boxes, Keys, Etc.) by G. 1,312,176.
- Provision and Installation of External Outlets (Simple) By Reticulated Metal Pillars. by G. 950,980.
- Provision and Installation of External Outlets (Industrial Type) By the Reticulated Metallic Pillars. by G. 2,411,200.
- Provision and Installation of Artifacts With Prismatic Transparent Polycarbonate Screens for Direct-Symmetrical Light, With Injected Aluminum Equipment Holder and Placed By the Structure Tensioners. Low Consumption Lamps – 400 W Mh / Sap per G. 42,497,400.
- Excavation for Foundations by G. 766.764.
- Raw Stone Foundation Laid by G. 4,096,392.
- 0.30 M Horizontal Asphalt in Elevation Walls. by G. 1,013,190.
- 0.30M Common Brick Leveling Masonry. by G. 2,047,812.
- Single Face Laminated Ceramic Brick Elevation Masonry, 0.15 M. by G. 9,323,776.
- Common Brick Elevation Masonry, 0.15 M. by G. 3,275,405.
- Rigged Over Openings, With Double Rod Ø 8Mm. by G. 214.116.
- Chained Superior of H ° A ° On Walls (15X30Cm) by G. 2,072,952.
- Roof Construction of Trapezoidal Corrugated Sheet N ° 26 Pre-Painted in Tile Color, With Metallic Structure of Profiles and Angles, Thermal Insulation Under Sheet and Anticorrosive Treatment With Final Synthetic Paint (With Verification of Calculations and Metallic Structural Designs) by G 9,114,336.
- Provision and Placement of Ceiling of Removable Cartoned Gypsum Panels, With Aluminum Profiles – Interior and Gallery. by G. 5,063,520.
- Subfloor Construction On Natural Terrain With 10 Cm Thickness. (Offices and Guardaobras) by G. 2.357.245.
- Construction of Smooth Folder for Ceramic Floor Base by G. 898.275.
- Provision and Laying of Ceramic Tiles Pei 5, According to Brand and Sample by G. 2,865,100.
- Smooth Cement Floor in Guardrails – Includes Expansion Joints. by G. 843,436.
- H ° Prefabricated Cords (0.50Mx0.40Mx0.07M Thick) in Guards. by G. 868.032.
- Provision and Placement of Ceramic Skirting Pei 4 OR 5, Color Similar To The Floor, H = 10 Cm. by G. 530,936.
- Construction of Interior Wall Plaster, Without Waterproofing. by G. 2,940,660.
- Of Beams and Exterior Walls, With Waterproof. by G. 429.184.
- Provision and Laying of Glazed Ceramic Tile in Bathroom, Color and Measurements To be Defined on Site. by G. 1,802,416.
- Provision and Placement of Decorative Guards and Lists in Ss.Hh. by G. 777.615.
- Provision and Installation of Door Single Sheet Cedar Slab Type P2 by G. 847.039.
- Provision and Installation of Bronze Color Aluminum Sliding Glazed Windows C / 6mm Glass – Color (Included in the Price). by G. 3,616,800.
- Provision and Placement of Bronze Color Aluminum Glazed Window with 6mm Glass – Color (Included in the Price). by G. 602,800.
- Provision and Installation of a Double Sheet Folded Sheet Door, With 5mm Fixed Glass and Bars Included – Type P1 (See Detail). by G. 1,447,716.
- Provision and Placement of Bars in Sliding Windows for G. 1,591,392.
- Application of Interior Filler on Walls by G. 1,593,666.
- Application of Interior Latex Paint on Plastered Walls. by G. 3,131,776.
- Application of Exterior Latex Paint on Beams and Plastered Walls. by G. 548.660.
- Application of Silicone on Exposed Laminated Ceramic Brick Walls. by G. 1,579,424.
- Application of Paint in Openings, To Glossy Synthetic Varnish. by G. 122.150.
- Application of Synthetic Paint on a Hinged Door of a Sheet of Bent Sheet, With Fixed Glass. by G. 309,726.
- Application of Synthetic Paint on Iron Grills. by G. 412,968.
- Application of Synthetic Paint in Gutters and Downspout Pipes. by G. 6,461,700.
- Provision and Placement of Mirror of 4Mm of 0.40Mx0.60M With Aluminum Frame. by G. 108.504.
- Provision and Placement of Color To be Defined On Site Toilet, Includes Flexible Connections. by G. 481.275.
- Provision and Placement of Lavatories With Pedestal Color To Be Defined On Site, Includes Flexible Connections. by G. 518,794.
- Provision and Placement of Half Slab Soap Dish. by G. 27,729.
- Provision and Placement of Slab Roll Holders With Plastic Shaft. by G. 32.123.
- Provision and Placement of Slab Towel Racks With Plastic Bar. by G. 33.154.
- Provision and Placement of Simple Slab Coat Racks. by G. 40,990.
- Provision and Placement of Toilet Seat Cover, in Padded Plastic Color To be Defined on Site. by G. 114,525.
- Provision and Placement of High Color Plastic Cistern To be Defined on Site. by G. 70.486.
- Provision and Placement of Electric Shower. Includes Metal Arm. by G. 120,560.
- Provision and Placement of Faucet for Automatic Closing Lavatory With Timer. by G. 277.288.
- Provision and Placement of for Pool in Laundry Room (Exterior): Tap With Mobile Peak. by G. 253.176.
- Provision and Placement of 100Mm PVC Pipes, Reinforced, C / Accessories, E / Registers, Septic Chamber and Absorbent Well. by G. 407.256.
- Bathroom Drain, Until First Record. Includes Pipes (Drainage, Ventilation, Etc.) and Accessories (Grilles, Elbows, Etc.) by G. 373.736.
- Sink Drain in Laundry Room (Exterior) by G. 217.008.
- Inspection Chambers (Variable Size and Depth) by G. 421.960.
- Septic Chamber – With Excavation. by G. 1,808,400.
- Absorbing Well (D = 2.00M and H = 3.00M) With Excavation. by G. 2,712,600.
- Extension of Running Water Installation – Pvc Pipe Dn 1 ″, Rigid Threadable, With Pvc Accessories With Metal Thread (From the Water Tank). by G. 1,331,040.
- Cold Water Installation in Sshh, Includes Pipes to the Entrance, Accessories and Stopcocks. by G. 355.652.
- Installation of Cold Water in the Laundry Pool, Includes Pipes to the Entrance, Accessories and Stopcocks. by G. 192,896.
- Provision and Placement of Lateral Gutter for Storm Drainage, of Sheet Fe G ° N ° 24 and Development of 0.50M. – Fronton Or Roof Cover: Same Design and Measure. by G. 663.080.
- Provision and Placement of 0.15MX 0.20M Fe G ° 24 Chapa de Fe Rainfall Downspout. by G. 361.680.
- Underground Power Supply From the Existing TS in the Adjacent Tank, To the Projected TS – Final Design of Electrical Inst. by G. 1,808,400.
- Provision and Installation of a Javelin for Land C / Connection Al Ts. (Includes Cooperweld Type Solder and 50Mm2 Bare Copper Cable.) By G. 904.200.
- Provision and Installation of Sectional Board With Phase Bar and Neutral, Rail, Tm Keys and Accessories by G. 2.411.200.
- Provision and Installation of Lights (Pipes, Cables, Keys, Etc.) by G. 874.660.
- Provision and Installation of Simple Outlets. by G. 612.262.
- Provision and Installation of Outlets With Grounding for Computer. by G. 201.094.
- Provision and Installation of Electric Shower Circuit by G. 301.400.
- Provision and Installation of 3X40 Watt Fluorescent Fixtures. by G. 1,880,736.
- Provision and Installation of 2X40 Watt Fluorescent Fixtures. by G. 554.576.
- Provision and Installation of 1X40 Watt Wall-Mounted Fluorescent Fixtures With Visor. by G. 361.680.
- Provision and Installation of Emergency Lighting – Fluorescent Fixtures 1 X 20 Watts. by G. 602,800.
- Provision and Installation of Plastic Rectangular Blind Covers. by G. 33.273.
- Provision and Installation of Ø 3/4 ″ Reserve Pipes. by G. 84.390.
- Telephone and IT Installation Expansion From the Nearest Existing Panel. by G. 1,808,400.
- Provision and Placement of Rj11 Sockets for Telephones, With Pipes, Wiring, Etc .. by G. 210.980.
- Provision and Placement of Rj45 Type Sockets for Computer Network (Wired) by G. 210.980.
- Differential Circuit Breaker. by G. 783.640.
- Abc Type Fire Extinguishers for All Types of Fire. by G. 3,496,240.
- Provision and Inst. Of Circuits for A ° A ° Split Type Apparatus by G. 311.816.
- Provision and Inst. Of A ° A ° Split Type Apparatus of 12,000 Btu per G. 1,748,120.
- Provision and Placement of Drainage Pipes for Aa. PVC Ø 25Mm. by G. 60.280.
- Material Countertop, Tiled, With a Reconstituted Granite Basin Pool – See Detail (Location: Outside) by G. 2,230,360.
- Final Cleaning of Work: Includes Cleaning of Sanitary Fixtures, Tiles, Screens, Pipes, Grids and Registers, Glass, Mirrors, Floors in General and Removal of All Debris. by G. 1,205,789.
The aforementioned firm’s legal representative is José Orlando Bordenave Tufari.
Twenty more companies came to the call:
- Angel Mazacotte Rodriguez
- Caldetec Engineering SRL
- Cx Construcciones SA
- Cx Construcciones SA
- Cx Construcciones SA
- Diego Rafael Beconi Ochipinti
- Diego Rodrigo Diaz Mallorquin
- Ecoservice Group SA
- Ecoservice Group SA
- Ecoservice Group SA
- SRL structures
- Gloria Patricia Cantero Benitez
- Hugo Constantino Giovine Gramatchicoff
- Mancan Group SRL
- Mancan Group SRL
- Mariela Carolina Molas Samudio
- Megga Imp.Exp. Anonymous society
- Miguel Augusto Amarilla Barrios
- Ricardo Moreno Balbuena placeholder image
- Sendero Sociedad Anónima