The company Ruben Darío Nuñez Esquivel was awarded for G. 350,895,831
In the course of the morning, the DNCP published that the company Ruben Darío Nuñez Esquivel was awarded for a total value of G. 350,895,831, and managed to win the tender for the Repair of the Roof, Floor and Electrical Installations, and Construction of Accesses and Sanitary in the Basic School No. 817 San Blas. with the ID 396,579. For this tender, offers began to be received on Tuesday, February 1, 2022.
The Municipality of Cambyretá was the institution in charge of carrying out the Call for Tenders No. 396,579 under the category of Construction, Restoration, Reconstruction OR Remodeling and Repair of Real Estateby the type of Bid Contest procedure.
The aforementioned institution awarded 40 items.
Preliminary Works by G. 15,767,085.
Sheet metal ceilings by G. 42.759.722.
Ceilings by G. 43.516.560.
Floors and baseboards by G. 58,642,697.
Electrical Installations by G. 19.915.028.
Paintings by G. 24,762,889.
Glasses by G. 406.274.
Installation of Acrylic Slate Embedded in Wall by G. 3,799,968.
Gutter by G. 2,608,780.
Preliminary Works by G. 2,039,661.
Soil Movement, Excavations and Fills by G. 1,966,309.
Foundations by G. 2,940,858.
Structure of H° A° by G. 8,493,307.
Leveling Wall by G. 788.667.
Waterproof insulation by G. 950.516.
Elevation Wall by G. 11.711.040.
Revoked by G. 5,757,570.
Roof by G. 11,945,082.
Ceiling tile by G. 6.724.172.
Subfloor, Floors and Baseboards by G. 10.234.206.
Metal Carpentry by G. 3,825,581.
Sanitary Equipment by G. 13.238.802.
Installation of Cold Water by G. 1,699,116.
Openings by G. 7,560,760.
Coatings by G. 4,982,320.
Paintings by G. 5,255,368.
Glasses by G. 1,066,470.
Electrical Installation by G. 1,703,918.
Preliminary Works by G. 337.400.
Soil Movement, Excavations and Fills by G. 868.455.
Leveling Movement of 0.30 per G. 3,406,224.
Subfloors by G. 1,720,771.
Electrical Installation by G. 6,565,934.
Brick Masonry by G. 1,243,891.
Metallic Carpentry by G. 8.438.636.
Structure of H° A° by G. 4,299,732.
Waterproof insulation by G. 503.913.
Plates by G. 1,110,624.
Metallic carpentry by G. 6.479.026.
Final Cleaning by G. 858.499.
The aforementioned firm has Ruben Darío Nuñez Esquivel and Sergio Alexis Nuñez as legal representatives.
Two more companies responded to the call: Diego Marcelo Jara Estigarribia and Habitare Srl.
This Sunday, December 21, at 10:03 a.m., the summer season officially began throughout Peru, according to the National Meteorology and Hydrology Service (Senamhi). Temperatures will remain within normal ranges during the 2025-2026
The National Police and the Public Ministry of the National District investigate the death of a 25-year-old young man that occurred during a preventive police intervention in the sector Villa ConsueloNational District,
The “Table of those who wait”, convened by the Committee for the Freedom of Political Prisoners, was replicated in Madrid (Spain), Buenos Aires (Argentina), Cúcuta (Colombia), Quito (Ecuador), Utrecht (Netherlands) and in
The rise of Starlink as a satellite connectivity solution has driven the development of various kits tailored to specific use cases. Two of the most prominent devices in the catalog are the
While the Cuban doctors retire, Antigua and Barbuda is already preparing to replace them with professionals from Ghana. LIMA, Peru – After 25 years of “health cooperation” with the Castro regime, Antigua