Today: December 5, 2025
October 24, 2025
1 min read

PR Consortium wins auction for Lot 4 of Paraná Highways

PR Consortium wins auction for Lot 4 of Paraná Highways

The PR Infrastructure Consortium (composed of EPR and Perfin Voyager Fundo de Investimento) won the auction for another lot of Integrated Highways of Paraná. The event was held this afternoon (23) at the headquarters of B3, the São Paulo stock exchange, and was attended by the Minister of Transport, Renan Filho, and the governor of Paraná, Ratinho Junior.PR Consortium wins auction for Lot 4 of Paraná Highways

This is lot 4 of a series of six concessions jointly promoted between the federal government and the government of Paraná, through the National Land Transport Agency (ANTT). The last competitions should end on October 30th, with the sale of lot 5.

Four companies presented proposals for lot 4 of the Paraná Integrated Highways. Initially, the proposals were presented on sealed paper by the companies, with Motiva (formerly CCR) offering 9.14% on the toll fee discount; Mota-Engil offering 6.23%; the PR Infrastructure Consortium offering 18.52%; and Reune Rodovias Holding offered 21.20%. As there was more than one proposal presented, the auction was sent to open outcry and, at this stage, Mota-Engil and Motiva were left out as they presented the lowest discount offers on the toll.

Over the open outcry, Consórcio Infraestrutura PR made the only bid of the day and won the auction with an offer of 21.30%, beating Reune Rodovias Holding.

>> Follow the channel Brazil Agency on WhatsApp

Lot 4 is 627.52 kilometers long and covers three federal highways (BR-272, BR-369 and BR-376) and eight state highways (PR-182, PR-272, PR-317, PR-323, PR-444, PR-862, PR-897 and PR-986). The stretch passes through the West, Northwest and North regions of Paraná, connecting both an access point from the border with Paraguay, in Guaíra, to the border with São Paulo, in Nova Londrina.

THE investment foreseen in the contract is R$ 18.17 billion. The concessionaire will be responsible for creating duplications, additional lanes, contours, marginal roads, pedestrian walkways, accesses and Rest Stops for truck drivers. According to the ministry, this concession should benefit 39 cities and generate 156 thousand jobs.

Lots

THE batch 1 was purchased by the Pátria group. THE batch 2 was won by the Infrastructure Consortium, the batch 3 was purchased by CCR and EPR won lot 6.

Source link

Latest Posts

They celebrated "Buenos Aires Coffee Day" with a tour of historic bars - Télam
Cum at clita latine. Tation nominavi quo id. An est possit adipiscing, error tation qualisque vel te.

Categories

They file a negative report on the Petro government financing law
Previous Story

Announcement of constituent assembly does not distract businessmen

The White House on Petro: "We do not see a de-escalation on the part of Colombia's deranged leader"
Next Story

The White House on Petro: "We do not see a de-escalation on the part of Colombia’s deranged leader"

Latest from Blog

Go toTop