Osvaldo Darío Martinez Romero was awarded by G. 151,642,490
In the course of the morning, the DNCP published that Osvaldo Darío Martinez Romero was awarded for a total value of G. 151,642,490, managed to win the tender for Construction of Classroom One Ground Floor With Tile Roof for Initial Level with ID 417,214. For this tender, offers began to be received on Monday, September 12, 2022.
Municipality of Luque was the institution in charge of carrying out the Call for Tenders No. 417,214 under the category of Construction, Restoration, Reconstruction OR Remodeling and Repair of Real Estateby the type of Direct Contracting procedure.
The aforementioned institution awarded 22 items.
Preparation of Work by G. 3,651,500.
Pbc foundation by G. 6,439,700.
Structure of Hºaº by G. 11,743,000.
Ground Movement. Filling and Compaction With Provision of Material by G. 1,247,250.
Asphaltic Insulation of Walls by G. 981,800.
Stonemasons in Gallery by G. 722.000.
Masonry Walls by G. 23.755.830.
Ceiling for G. 29,900,000.
Revoked by G. 12.023.170.
Subfloors by G. 5,059,630.
Floor by G. 6,792,380.
Ceramic skirting by G. 945.460.
Wood openings for G. 3,540,000.
Metal Openings for G. 6,820,000.
Painting by G. 9,618,780.
Tile coating by G. 3,189,900.
Furniture for G. 708,000.
Rampa de H° Includes Buñas and Painting for G. 1,610,000.
Installation of Electrical Appliances and Accessories (Materials and Labor) for G. 5,337,000.
Sanitary and Sewage Installation- Includes Allowance, Accessories for Sexed and Inclusive Boxes, Supply of Running Water and Sewage Drainage – Absorbent Well and Septic Chamber (Connection Until the First Registration)- (Includes Labor and Materials) for G. 7,925,000 .
Patio Storm Drain for G. 9,050,000.
Final Cleaning (Includes Debris Hauling) for G. 582.090.
The aforementioned firm’s legal representative is Osvaldo Darío Martinez Romero.
Three more companies came to the call: Carlos Alfonso Molinas Ayala, Felix Caceres Roman and Reinaldo Blanco Aquino.
The Ministry of Health signed an unprecedented agreement to expand the actions of the Agora Tem Especialistas program in Rio Grande Sul. Grupo Hospitalar Conceição (GHC), a public company linked to the
Unit 8 of the Máximo Gómez thermoelectric plant left the system this morning due to “turbine instrumentation problems.” LIMA, Peru – The Electrical Union (UNE) predicted for December 20 that simultaneous blackouts
The Federal Civil Aviation Agency opened an administrative investigation into the incident that occurred on a Magnicharters flight to Cancun, after a pilot stopped the operation of the aircraft after being notified
The mayor of Carabayllo, Pablo Mendoza, was the victim of an assassination attempt by some individuals who shot during the inauguration of works in the district. News in development… Source link
Secretary Kristi Noem indicated that the seizure of the second oil tanker occurred “before dawn” on Saturday, December 20, in an operation by the US Coast Guard and that it had the