Today: September 21, 2024
December 18, 2021
1 min read

MOP will make a detour from the entrance of Panama Pacifico with exit to the Veracruz area

The works to be carried out consist of the laying of 1.80-meter pipes of the PATSA Pipeline, transversal to the Pan-American highway, the total closure of two lanes will be carried out in the direction of Arraiján towards Panama

MOP will make a detour from the entrance of Panama Pacifico with exit to the Veracruz area

MOP will make a detour from the entrance to Panama Pacifico with an exit to the Veracruz area. Photo: Courtesy

Celia douglas

The Ministry of Public Works (MOP), through a press release, informs to users and residents of Panama Oeste, that from Friday, December 17 until Saturday, December 18, a detour will be made through the entrance of Panama Pacifico with exit to the Veracruz area from 11:00 pm to 2:00 pm: 00 am

The works to be carried out consist of the laying of 1.80 meter pipes of the PATSA Pipeline, transversal to the Pan-American highway, the total closure of two lanes will be carried out in the direction of Arraiján towards Panama.

Previous presentation of the attached document:



Source link

Latest Posts

They celebrated "Buenos Aires Coffee Day" with a tour of historic bars - Télam
Cum at clita latine. Tation nominavi quo id. An est possit adipiscing, error tation qualisque vel te.

Categories

They report 80 new positive cases and another 5 deaths from COVID-19
Previous Story

They report 80 new positive cases and another 5 deaths from COVID-19

Daniel Ortega Policía Ejército de nicaragua
Next Story

Daniel Ortega says that the Police and the Army obey the “mandate of Christ”

Latest from Blog

Go toTop