Today: December 5, 2025
September 11, 2025
2 mins read

López Aliaga trains in poor condition: Report reveals that 84 cars of the 90s will need repairs before operating

López Aliaga trains in poor condition: Report reveals that 84 cars of the 90s will need repairs before operating

Lima-Chosic trains that Rafael López Aliaga proposes to incorporate the Lima Railway System present serious failures and deficiencies which must be repaired before operating. The technical report made by Rail Electrical Services LLC And revealed by ‘La Enclerrona’, shows that 84 cars of the 90 -type Gallety need to be reconditioned, because the control cabin is missing the radio and its cables, the safety module is not operational, it has a shipyard window, handrails of the detached lobby, among other damages.

Source link

Latest Posts

They celebrated "Buenos Aires Coffee Day" with a tour of historic bars - Télam
Cum at clita latine. Tation nominavi quo id. An est possit adipiscing, error tation qualisque vel te.

Categories

Scandals have questioned criminal proceedings against Donni Santana
Previous Story

Scandals have questioned criminal proceedings against Donni Santana

Next Story

TEPJF ratifies: the voting of votes in Poza Rica, Veracruz proceeds

Latest from Blog

Go toTop