As part of the third delivery of materials and electrical supplies to respond to requests from citizens made through the 1×10 System of Good Governancethis Tuesday 211 transformers of different powers were distributed, 6,837 LED technology lights as well as other equipment for the Venezuelan population.
The activity was carried out in the spaces of the Chacao Service Center, located in the state of Miranda, and was attended by the Sectorial Vice President of Public Works and Services, G/J Nestor Reveroldisclosed a Corpoelec press release.
Reverol stressed that “we are delivering a batch of materials, equipment and 6,837 lights, as well as 211 transformers, which are deployed throughout the national territory to resolve 373 cases, benefiting more than 30,500 families” .
The General-in-Chief added that every Tuesday the Third Strategic Line of Government Action is established, such as the right to the environment, to the city and to public services, through equipment and resources destined to guarantee stability and reliability. of the National Electric System.
For its part, Douglas Malave, carrier of the heavy fleet, assigned to the Goods and Services area of Corpoelec – Anzoátegui, expressed his pride in “contributing a grain of sand in bringing the transformers to the communities that need it”.
Equally, Michael Tovaralso belonging to the heavy fleet of Corpoelec – Guárico, considered it excellent to be able to “meet the needs of each sector and each municipality, it is something positive for the beneficiaries.”
The president of the National Electric Corporation (Corpoelec), Ing. Jose Luis Betancourt; the president of Corpoelec Industrial, G/D Juan Ramon Rodriguez and the managers of Distribution, Security, Goods and Services.
LEARN MORE:
VTV/Ora/EMPG