Hermelinda Arrúa Lopez was awarded by G. 220,074,606
During the afternoon, the DNCP published that Hermelinda Arrúa Lopez was awarded for a total value of G. 220,074,606, managed to win the tender for the Repair of a Block of Three Classrooms and Management in the Basic School No. 3376 Santa Teresa Dejesus with ID 415,334. For this tender, offers began to be received on Friday, September 30, 2022.
Municipality of Mayor Otaño was the institution in charge of carrying out the Call for Tenders No. 415,334 under the category of Construction, Restoration, Reconstruction OR Remodeling and Repair of Real Estateby the type of Bid Contest procedure.
The aforementioned institution awarded 52 items.
Cleaning and Preparation of the Work by G. 1,009,260.
Layout and Marking by G. 1,302,693.
Fencing of Work and Workroom by G. 6.177.389.
Identification Poster of the Work by G. 1.084.340.
Removal of Tiles and Wooden Ceiling Preserve Wooden Structure by G. 2,814,002.
Stripping of Tiles Preserve Wooden Structure by G. 842.296.
Dismantling of Electrical Appliances by Environment by G. 585.212.
Dismantling of Electrical Installation by Environment by G. 439.872.
From Door and Frame by G. 252.576.
Demolition of Zocalo by G. 642,880.
Demolition of Ceramic Floor and Counter Floor by G. 2,406,471.
Plaster of Interior Walls (Elevation, Walls Between Ceiling and Ceiling) by G. 2,210,772.
0.15 Elevation Walls With Common Brick Includes Three-Sided Plaster for G. 2,793,739.
Repair of Vertical and Inclined Cracks With Z-Type Seam With Wire Mesh Steel Rod, Includes Plaster by G. 1.202.398.
Cascote Concrete Subfloor by G. 8.115.465.
Cement Folder Desg. (1;3) 2Cm by G. 7,785,720.
Non-slip ceramic floor with floor on floor by G. 18.883.842.
Ceramic skirting board of 8 cm by G. 2,814,420.
Provision and Placement of Pre-Painted No. 26 Thermoacoustic Sheet Metal Ceiling 30X50 Industrial Pipe Sinks and 1.20 Wall Over Existing Braces Both Painted Synthetic Reuse Wooden Braces Expect 20% of Braces Damaged by G. 94,713,800.
Gutter of Caño de Bajada N° 26 – Development 33 Cm (Includes Painting) by G. 7,232,935.
Reconditioning of Rocker Type Windows, Removal of All the Glass and Replacement of the Same (4Cm) Placement of Glass With Solicona and Cleaning of The Same, Includes Synthetic Paint by G. 4,934,549.
Metal door of 1.20 X 2.10 for G. 5,304,000.
From Interior Walls Rendered To Latex Sand Color by G. 3.471.048.
Of Plastered Interior Walls Elastomeric Or Synthetic Membrane Alt. 1.5 by G. 3.248.355.
From Exterior Walls Rendered To Latex Sand Color (Includes Pillars, Gallery Beams and Window Moche) by G. 2,297,277.
Of Plastered Exterior Walls Elastomeric Or Synthetic Membrane Alt 1.5 Includes Pillars and Window Butts by G. 1,841,153.
Leveling With Elastomeric Or Synthetic Membrane by G. 233.853.
From Bars and Metal Doors to Synthetic by G. 2.161.744.
Of Reticulated Metal Beam and Gallery Beam by G. 1.185.288.
Food Points and Outlets Low High by G. 2.260.049.
Supply of Acrylic Bell Type Light Fixtures With 60W Cold Light Led Lamp by G. 1.670.675.
Supply for Led Lamp Spotlight 18W Cold Light in Gallery by G. 393.100.
Power for Low Consumption Spotlight 80W Exteriors by G. 294.774.
Food for A/C by G. 393.032.
Power Supply for Fan Circuit by G. 687.806.
Power supply for Circuit Tc by G. 393.032.
Power supply for Tcv Circuit by G. 486.076.
Food for Electric Bell by G. 514.723.
Installation of 20Ag Ts10 Board by G. 315.593.
Installation of Tc Board by G. 1.262.728.
Supply of Acrylic Bell Type Light Fixtures With 60W Cold Light Led Lamp by G. 7.603.811.
Supply for Led Lamp Spotlight 18W Cold Light in Gallery by G. 577.320.
80W Low Consumption Base and Spotlight with Outdoor Protector by G. 576.849.
Ts 10 Board of 20 Ag With Phase and Neutral Bar by G. 511.974.
20 Ag Tc board by G. 347.104.
Tcv Board for 2 Fan Keys by G. 347.104.
Save Work To Be Built Cement Folder (Includes Leveling Masonry) by G. 4,369,411.
Save Work To Repair Cement Folder by G. 1,210,216.
Access Ramp for the Disabled Plan a Pipe for Stormwater Drainage by G. 1,217,174.
Crylic Slate by G. 4,141,983.
Blackboard Repair Includes Painting by G. 1,642,239.
Final Cleaning of Work by G. 870.484.
The aforementioned firm’s legal representative is Hermelinda Arrúa Lopez.
One more company came forward to the call: Constructora Jovenes Unidos Jjg SA.
The Civil Police of Rio closed this Thursday (7) a warehouse that produced counterfeit olive oil and arrested four people in the act for crimes against consumer relations and fraud in commerce.
More than 2,000 officials from the National Tax and Customs Directorate (Dian) will take to the streets of the different cities of the country this week, to respond to an alert that
SLP, Mexico.- The Cuban regime admitted this Thursday that so far they have registered around 461 total and partial collapses in Havana and thousands of evacuees due to the passage of the
The agreement of the Jurisdictional Commission was that in a first stage “we are going to unload, first as a priority, what comes in this legislature. The second order of priority, what
The National Assembly of Regional Governments (ANGR) issued a statement to express its support for the Asia-Pacific Economic Cooperation (APEC) summit, highlighting the crucial role of this event in promoting the economic