The Ruta Verde project is a project undertaken by the ITAIPU Paraguay Technology Park (PTI-PY) and sponsored by ITAIPU Binacional, through the Renewable Energy Advisory, with the aim of installing charging stations for electric vehicles along the Route PY02, making it possible for motorists to recharge and drive from Asunción to Ciudad del Este and Hernandarias.
Source link
Green Route: the start-up of electric vehicle charging stations progresses
Latest from Blog
Global water cycle altered for the first time in history: effects on the economy
An article published by CNN in Spanish warns that “for the first time in human history” The global water cycle has become unbalanced, raising fears of a growing “water disaster”with consequences for
China registers its worst growth data in more than a year
This figure slightly exceeds the expectations of the experts interviewed by AFP, who predicted an average growth of 4.5%. However, it is lower than the +4.7% in the April-June period and, above
Fiscal deficit remains at 4% of GDP
For the fifth consecutive month, the fiscal deficit accumulated in the last 12 months represented 4% of the Gross Domestic Product (GDP), according to information from the Central Reserve Bank (BCR). Look:
They develop a convention on arbitration in the DR
Although the country has made progress in arbitration for conflict resolutionthe judicial alternative requires more specialized experts that contribute to expanding the scope of this private method to resolve incidents that require
Curaçao Court evaluates the evidence provided by the BOD Group about its assets
After the delivery of the documents of the assets with which the BOD Financial Group can cover the debt of the clients of Banco del Orinoco NV, it now remains to demonstrate