In the course of the morning, the DNCP published that Feriano Zarza was awarded for a total value of G. 186,025,000, and managed to win the tender for the Construction of Two Classrooms in Esc. Bas. No. 737 Fulgencio Yegros with ID 416,974. For this tender, offers began to be received on Monday, September 26, 2022.
The Municipality of Hohenau was the institution in charge of carrying out the Call for Tenders No. 416,974 under the category of Construction, Restoration, Reconstruction OR Remodeling and Repair of Real Estateby the type of Bid Contest procedure.
The aforementioned institution awarded 26 items.
Plate Fence N°27, H=2M With Sliding Gate, Complementary Services. by G. 5,011,200.
Cleaning of Work by G. 1,349,962.
Excavation and Foundation Loading Service With Pbc by G. 9,397,392.
Placement of Reinforced Concrete by G. 9.216.084.
Construction of Leveling Wall by G. 2,845,944.
Filling and Tamping of Interiors by G. 4,095,960.
Horizontal Asphaltic Insulation of Walls by G. 879.466.
Construction of Elevation Wall by G. 16.928.446.
Pillar by G. 3,391,608.
Tile Roof With Machine-Pressed Tejuelones and 2″ X 6″ Hº Aº Braces With 1 ½” X 3″ Bocasa Strip by G. 52.896.000.
Revoked by G. 4,750,896.
Placement of Floors – Subfloors by G. 7,610,396.
Ceramic Type Floor by G. 6,528,480.
Installation or placement of Zocalo by G. 1,311,960.
Openings by G. 9.172.166.
Window Sills – Plaster 1:3 (Cement – Sand) by G. 1,571,846.
Painting Service by G. 19.349.037.
4Mm Double Glass by G. 3,683,232.
Storm Drain: Canaleta y Caño de Bajada 26 – Development 40 Cms. by G. 3,935,880.
Save Cement Smoothing Works With Subfloor by G. 1.963.764.
Construction and Electrical Installations by G. 10,652,280.
Installation of Electric Energy Devices for G. 2,853,600.
Electrical Register of 40 X 40 X 70 Cms. for G. 522,000.
Construction of Pedestrian Ramp by G. 1,043,305.
Fine Plaster- Slate Embedded in Wall by G. 1.948.800.
Final Cleaning by G. 3,115,296.
The aforementioned firm has Feriano Zarza as its legal representative.
Three more companies appeared at the call: Amado Cabañas González, Emilio Gustavo Cardozo Piriz and Hermelinda Arrúa Lopez.
After more than 25 years of negotiations, the trade agreement between Mercosur and the European Union (EU) was approved this Friday (9) by the EU Council. Expected to be signed on the
Located in Curití, Santander, just 20 minutes from San Gil, these wells of natural and crystalline waters, known as the Eden of Paradisehave become one of the most visited tourist attractions in
This January 8 marked twenty years since the death of my brother Rapi. His full name was Constante Alejandro de Diego García Marruz and he was born on January 6, 1949. He
“Any unilateral military action by the United States within Mexico without the latter’s consent would destroy trust, undermine cooperation with Mexican authorities, and make the fight against drug trafficking even more difficult
By: Feliciano Gutiérrez The relatives of the victims, groups, residents of Juliaca and delegations from other regions participated in the different activities in memory of those murdered on January 9, 2023 during