Facundo José Correa Godoy was awarded by G. 808,487,693
During the afternoon, the DNCP published that Facundo José Correa Godoy was awarded for a total value of G. 808,487,693, managed to win the tender for the Construction of Medical Dispensaries and Various Works with the ID 420,143. For this tender, offers began to be received on Tuesday, October 25, 2022.
Departmental Government of Concepción (CONCEPCIÓN) was the institution in charge of carrying out the Call for Tenders No. 420,143 under the category of Construction, Restoration, Reconstruction OR Remodeling and Repair of Real Estateby the type of Bid Contest procedure.
The aforementioned institution awarded 82 items.
Poster of Works by G. 4,166,000.
Layout and Marking by G. 1,722,240.
Filling and Manual Compaction for G. 9,250,000.
H°A° shoe. by G. 14,590,500.
Lower chaining of H°A° by G. 32.224.230.
Pillar of H°A°. for G. 9,627,000.
Upper beam of H°A°. by G. 15,645,680.
Leveling masonry of 0.30 cm. by G. 5,678,010.
Leveling masonry of 0.30 cm. by G. 9,429,570.
Elevation in Masonry in Common Brick of 0.15 Cm. for G. 31,020,000.
Elevation in Masonry in Common Brick of 0.30 Cm. by G. 5,997,189.
Elevation in Exposed Brick Masonry Laminated with Gloss and Anti-Humidity Treatment. by G. 8,782,200.
Interior plaster A layer of 1.5 cm thick with water repellent. for G. 11,092,000.
Exterior Wall Plaster One Layer 1.5 Cm Thick With Water Repellent. for G. 10,434,000.
Interior Latex Paint by G. 10.160.508.
Exterior Latex Paint by G. 9.557.766.
Ceiling in Thermopanels With Metallic Profiles in Caño Painted White, for G. 70,080,000.
Concrete subfloor and rubble. by G. 8,461,001.
Floor Regularization Folder. by G. 7,182,569.
Placement of Non-slip Pi4 Ceramic Floor. by G. 21,360,247.
10 cm socket. by G. 3,211,200.
90X210 Blindex Type Door. by G. 4,398,408.
Painted Plate Type Door 70 Cm. for G. 2,512,000.
80 Cm Plate Type Door. Painted. by G. 7,336,002.
Gray Blindex Type Windows, by G. 20.944.800.
Installation of Sanitary Equipment (Includes Toilet With Low Water Tank, Shower, Lavatory With Pedestal and Accessories) by G. 12.134.666.
Installation of Cold Drinking Water. by G. 6,653,334.
Sewage Drain Does Not Include Septic Chamber. by G. 37,012,644.
Electrical Installation According to Ande Standards. by G. 30,065,546.
Letter Printed on Vinyl Canvas Folded To Sheet Metal Molding With Led Type Light. Height of Letters 70 Cm. for G. 12,360,000.
Simple Horgimon Ramp. by G. 3,079,440.
Molding for Front Facade by G. 5,572,000.
Sheet metal gutter with drop by G. 20.649.162.
Septic Chamber and Blind Well by G. 13.614.666.
20X20 Ceramic Coating for Bathroom. by G. 6,532,650.
Installation of Air Conditioning System for 24,000 Btu. by G. 12,534,666.
Installation of Air Conditioning System for 18,000 Btu by G. 21,277,332.
Poster of Works, According to Technical Specifications. by G. 2,296,667.
Repair of Roof With Treatment and Reuse of Wood, Includes Demolition of Roof With Recovery, Lowering The Wood and Painting Completely With Anti Termite Product, Includes Tejuelones and New Top Quality Roof Tiles. Includes Replacement of Damaged Wood. Slope 30%. for G. 67,650,000.
Embedded Gutter of Development Sheet 70 Cm. by G. 5,557,491.
Galvanized sheet downspouts. by G. 1,348,750.
Downpipes and Horizontal Pipes of Pvc 150 Mm. by G. 5,187,500.
Clearing and solidification of Pluvial Drainage Pipes. by G. 899,167.
Dismantling of Existing Gutters and Solid Walls. by G. 4,345,020.
Electrical Installations, Placement of Led Lights Where Indicated by the Works Prosecutor. by G. 3,043,333.
Corrugated Metal Sheet Roof No. 28 With Profile Structure. by G. 10,486,400.
30X30 Cm Masonry Pillar in Common Brick. by G. 774.669.
Elevation masonry in common brick with rods of 0.15 cm. by G. 756,962.
Interior and exterior plaster by G. 542.820.
Interior and Exterior Latex Painting. by G. 542,820.
Sewage Drainage Repair in the Bathrooms. Includes Change Low Cistern, Records If It Was the Case, Repair of Septic Chamber. by G. 9,683,333.
Installation Repair. Includes Change of Faucets, Step Keys, Filtration Repair. by G. 6,916,667.
Poster of Works According to Technical Specifications. by G. 2,296,667.
Layout and Marking. by G. 1,008,450.
Filling and Manual Compaction. by G. 4,565,010.
Footing of H°A° Includes Excavation. by G. 5,393,713.
Foundation Beam H°A° by G. 8.429.443.
Pillar of H ° A °, Includes Shaft. by G. 6,670,794.
Leveling Masonry in Common Brick of 0.30 Cm. by G. 4,008,900.
Elevation Masonry in Exposed Brick Laminated to One Side. by G. 8,235,179.
Elevation Masonry With 0.15 Cm Hollow Brick. by G. 11,023,211.
Pillar in Exposed Brick of 37X37 Cm. With H°A° core. by G. 4,564,996.
Asphalt insulation 0.15 cm. by G. 2,068,462.
Trapezoidal Type Sheet Metal Roof With Metal Structure. pending 13%. by G. 28,250,900.
Interior and exterior plaster. for G. 8,300,000.
Interior and Exterior Painting. for G. 8,300,000.
Underlayment of H°Y Cascotes. by G. 5,671,598.
Floor Folder. by G. 3,811,405.
Placement of Ceramic Floor Pi4. by G. 10,082,870.
Ceramic plinth. by G. 1,316,814.
Ceramic coated. by G. 968,330.
Door Interior Plate 80X210. Includes Painting. by G. 1,521,666.
Door Interior Plate 70X210. Includes Painting. by G. 760,833.
Door Board 200X210. Includes Luster. for G. 2,490,000.
Rocker Window. by G. 7,071,600.
Glass. by G. 3,064,354.
Electrical installations. 2X40W Flourescent Fixture in Each Office and 3 in the Waiting Room, Power Outlet in Each Office Two Units as a Minimum. Ceiling fans 1 for each office and 2 waiting room. by G. 11,066,666.
Running Water Installation. by G. 4,841,667.
Installation of Sewage Drain. for G. 6,225,000.
Septic chamber. by G. 4,841,667.
Storm Drain With Downspout. by G. 3,873,340.
Periodic and Final Cleaning of the Work. by G. 1,383,333.
The aforementioned firm has Facundo José Correa Godoy as its legal representative.
Two more companies appeared at the call: Elvira Elizabet Sartorio Blanco and Oscar Edilson Ortiz Garcete.
AREQUIPA, Peru – “The rest of the Oriente fault that was asleep in recent days, until now normal in the areas near Santiago de Cuba, is beginning to ‘wake up’,” warned Enrique
The Attorney General’s Office (FGR) reported on the destruction of 33 cars of the so-calleds “monsters” with artisanal armor that were insured in various confrontations in Tamaulipas and are related to 29
“They have been hard days of work, but very productive. We have seen our image reinforced as a country open to trade, investment and international cooperation. Committed to dialogue and generating consensus
He Senate of the Republic approved yesterday in second reading in an extraordinary session the project that modifies Organic Law 138-11 of the Council of the Judiciary for the purposes of adapting
Recently, two individuals from Paysandu They have been convicted after a summary trial. The subjects, aged 29 and 36, were charged with the entry into the country of almost 10 kilos of