The East Electricity Distributor Company (Edeeste) on Thursday that he made a sweeping type operation In the Villa España sector, San Pedro de Macorís province, in which it dismantled several illegal connections by users of the electric service. One of them corresponded to a company that had a underground wiring.
Through a press release, Edeeste indicated that the operation directly impacted a radio stationseveral residential homes, as well as to truck companies and heavy equipment workshops, “whose managers carried out activities that caused losses in the area.”
It also points out that it was possible to remove some 200 meters of concentric cable 6/3 Soterrado installed illegally, which fed a truck company. Of the Tríplex cable were removed Another 260 meters wiring.
He argued that, “after the Soterrado cable dismantling The client returned to connect illegallywhich is why the Physical Security Assistance for due normalization. “
Intervention Plan
Edeeste He said that these executors are part of the Intervention Plan For the Reduction of technical and non -technical lossesscheduled to be held at the SPM-102 circuit from this month of September and will run until December of this year.
He reiterated his commitment to the national strategy of “zero tolerances to Electric fraud“, since this not only financially affects the system, but also causes a Overload in the distribution networkreduces the quality of the service for other users and more expensive operating costs. “
- The company also called the Dominican population to denounce all kinds of illegal actions that affect the electrical system for institutional channels.
