In the course of the morning the DNCP published that Construpar SRL was awarded for a total value of G. 395,932,700, managed to win the tender for Roof Repair of 2 Classroom Pavilions and Other Works – Elementary School 2659 Virgen de Fatima – Compañía Misfortune Cue – San Pedro del Paraná with the ID 417.663. For this tender, offers began to be received on Monday, October 24, 2022.
The Municipality of San Pedro del Paraná was the institution in charge of carrying out the Call for Tenders No. 417,663 under the category of Construction, Restoration, Reconstruction OR Remodeling and Repair of Real Estateby the type of Bid Contest procedure.
The aforementioned institution awarded 118 items.
- Block 1 – Work Poster 1.0 X 2.00 for G. 897,000.
- Inauguration plaque for G. 849.600.
- General Layout of Pavilion Works – Sector to Intervene for G. 5,694,000.
- Roof Extraction: Includes French Tiles + Alfajias + Wood Beams. in Classrooms + Gallery for G. 4,400,000.
- Extraction of Electrical Artifacts: Fans + Lighting Equipment + Points and Sockets (Includes: Wiring) Distribution Boxes + Electroducts are maintained for G. 525,000.
- Extraction of Openings: 04 Wooden Doors – to Exchange for Metal Doors for G. 118,400.
- Extraction of Plaster in Damp Conditions Inside Classrooms by G. 317,500.
- Extraction of Ventiluz Type Window in Classroom 01. by G. 26,300.
- Open Opening for Placement of 3rd Window in Classroom 01 by G. 54.540.
- Demolition of Masonry Columns in Existing Galleries for G. 232,900.
- Extraction of Subfloor + Existing Floor in Classrooms + Gallery. by G. 2,722,500.
- Masonry Demolition Until Reaching Higher Chaining Level To Be Done. for G. 726,000.
- Extraction of Existing Trees in Front of Gallery. (Mango + Guava + Shrubs) for G. 3,974,000.
- Extraction of Glass from Existing Windows for Replacement to New for G. 114,300.
- Excavation for Raw Stone Foundation for Expansion of Gallery in Block 01. Dimensions: 0.30 Width 0.60 Depth. Includes Base for Columns in Gallery for G. 295,000.
- Rough Stone Foundation Placed for Gallery Expansion for G. 2,025,000.
- Leveling Masonry 30 Cm X 20 Cm Height. On Rough Stone Foundation by G. 717.500.
- Leveling Masonry for Pillars in Gallery 0.45 X 0.45 X 20 Cm Height by G. 191,500.
- Pillars of Common Bricks 0.45 X 0.45 in Gallery. by G. 3,293,750.
- Elevation masonry on top chaining (To be done) with common bricks up to reaching levels of seat metal braces and ridge for G. 3,530,500.
- Solid and Profiled Openings for Placement of Openings (Metallic Doors Access to Classrooms) + New Windows in Classroom 01 for G. 504,000.
- 0.15 X 0.15 Concrete Columns Masonry Pillars in Gallery. Includes Capitals for All Columns per G. 817.775.
- Concrete Cubes for Seating of Metal Ridge Beams on Walls. (1.0 Length X 0.20 Height X 0.15 Thickness) by G. 441,940.
- Chained Reinforced Concrete 0.15 X 0.30 On Existing Walls. by G. 6,551,200.
- Subfloor of Rubble in Classrooms + Gallery. – Thickness 10 Cm per G. 8,188,000.
- From Rubble to Guardaobra. Includes Space Between Pavilions for G. 2,937,000.
- Concrete tile floor 40 X 40 in Guardaobra; See Plan by G. 7.365.600.
- Carpet for Ceramic Floor in Classrooms + Gallery by G. 7.615.760.
- Ceramic Floor: in Classrooms + Gallery by G. 19.264.800.
- Interior Ceramic Zocalo of Classrooms + Galleries by G. 3,097,200.
- Windowsill by G. 117,700.
- On New Masonries On Superior Chaining. Includes Superior Chained Envelope To Be Made for G. 4,466,000.
- On Masonry Area With Humidity Problems» by G. 1.767.500.
- Metal Ridge Beam. Dimensions 20 X 40 by G. 7,939,800.
- Metal Beam in Gallery. Dimensions 0.20 X 0.30 per G. 6,490,000.
- Provision and Placement of Machimbre on Metal Profiles. for G. 23,634,000.
- Provision and Placement of Thermoacoustic Insulation Type Isolant 10 Mm by G. 9,734,400.
- Ceramic Color Sheet Metal Ceiling Over Metal Profiles: by G. 21.972.600.
- Sheet Metal Gutters + Sheet Metal Downspouts by G. 7,350,500.
- Lateral Metal Nefas – Edge at the Ends of the Roof by G. 2,435,400.
- Sheet Metal Trestles on Ridge – Wide Development 60 Cm per G. 2,435,400.
- Provision and Placement of General Board With New Keys» for G. 485,000.
- Placement of Sectional Boards in Each Classroom» for G. 1,470,000.
- Power Circuits for Fans by G. 3,011,200.
- For the Placement of (04 Point and Socket Units) + (16 Low Socket Units)» for G. 2,650,000.
- Double Led Fluorescent Fixtures: 04 Classrooms per G. 2,350,600.
- Individual Led Fluorescent Fixtures With Photocell for Gallery + Side Facades for G. 496.800.
- Ceiling Fans With Metal Boxes for G. 5,488,000.
- Provision + Placement of Metal Doors 0.80 X 2.10 Includes Hardware» for G. 4,080,000.
- Provision and Placement of (01) Ventiluz-Type Metal Openings Dimensions: 1.50 X 1.20 by G. 937.800.
- Provision and Installation of 4 Mm Transparent Glass – Glued With Putty for G. 2,688,000.
- General Interior / Exterior On All Walls. Includes Chained Concrete. for G. 14,062,000.
- Painting on Rendered Pillars in the Gallery Includes Capitals in Ceramic Color by G. 996.800.
- On Metal Openings (Doors + Windows) for G. 1,890,000.
- On Sheet Metal Gutters + Downspouts by G. 1,104,100.
- Painting on Machimbre de Madera in Classrooms + Gallery» by G. 9.594.000.
- Paint on Metal Ridge Beam 0.20 X 0.40 by G. 717.400.
- Painting on Metal Beam in Gallery 0.15 X 0.30 by G. 548.600.
- Construction of Slates With Wood Structure; Includes Side Frames and Chalk Holder. Painted in Green Color Base for Writing and With Varnish on the Edges + Holders for G. 4,040,000.
- Final Cleaning of Works for G. 1,144,000.
- Block 2 – “General Layout of Pavilion Works – Sector to Intervene” for G. 4,180,000.
- Roof Extraction: Includes French Tiles + Tejuelones + Alfajias + Wood Beams. in Classrooms + Gallery + Bathroom Sexed by G. 2,768,500.
- Extraction of Electrical Artifacts: Fans + Lighting Equipment + Points and Sockets (Includes: Wiring) Distribution Boxes + Electroducts are maintained for G. 334,000.
- Extraction of Openings: 04 Wooden Doors – to Exchange for Metal Doors for G. 118,400.
- Extraction of Plaster in Damp Conditions Inside Classrooms by G. 423.500.
- Extraction of Ventilation Type Window in Bathrooms for Placement of New Openings for G. 52,600.
- Open openings for placement of windows in sexed bathrooms. for G. 30,300.
- Demolition of Masonry Columns in Existing Gallery. Includes: Masonry on Columns. for G. 256,000.
- Extraction of Subfloor + Existing Floor in Classrooms + Gallery + Sexed Bathrooms. by G. 1,337,700.
- Masonry Demolition (In Old Classrooms) Until Reaching Higher Chaining Level To Be Done. by G. 334,500.
- Excavation for Raw Stone Foundation for Expansion of Gallery in Block 02. Dimensions: 0.30 Width 0.60 Depth. Includes Base for Columns in Gallery for G. 277.650.
- Rough Stone Foundation Placed for Gallery Expansion for G. 1,741,500.
- Leveling Masonry 30 Cm X 20 Cm Height. On Rough Stone Foundation» by G. 718.500.
- Leveling Masonry for Pillars in Gallery 0.45 X 0.45 X 20 Cm Height» by G. 199.500.
- Pillars of Common Bricks 0.45 X 0.45 in Gallery. by G. 2,821,500.
- Elevation masonry on top chaining (To be done) with common bricks up to reaching levels of seat metal braces and ridge for G. 3,925,000.
- Solid and Profiled Openings for Placement of Openings (Metallic Doors Access to Classrooms) + New Windows in Classroom 01 by G. 804.000.
- 0.15 X 0.15 Concrete Columns Masonry Pillars in Gallery. Includes Capitals for All Columns by G. 957.740.
- Concrete Cubes for Seating of Metal Ridge Beams on Walls. 1 X 0.30 X 0.15 by G. 482,700.
- Chained Reinforced Concrete 0.15 X 0.30 On Existing Walls. by G. 4,523,700.
- Of Rubble in Classrooms + Gallery + Bathrooms. – Thickness 10 Cm per G. 4,814,000.
- From Rubble to Guardaobra. – Block 02 – See in Plan by G. 2,490,000.
- Concrete tile floor 40 X 40 in Guardaobra; See Plan for G. 6,696,000.
- Carpet for Ceramic Floor in (02) Classrooms + Gallery + Bathrooms for G. 4,988,000.
- Ceramic Floor: in Classrooms + Galleries + Bathrooms Sexed by G. 11,716,000.
- Ceramic Zocalo Interior of Classrooms + Galleries by G. 1,735,500.
- Window Sills – Only in Sexed Restroom Openings” by G. 128.400.
- On New Masonries On Superior Chaining. Includes Superior Chained Envelope To Be Made for G. 2,808,000.
- Ceramic Coated Height 2 Meters in Two Bathrooms for G. 1,812,000.
- On Masonry Area With Moisture Problems» by G. 2,114,000.
- Metal Ridge Beam. Dimensions 20 X 40 by G. 4,514,000.
- Metal Beam in Gallery. Dimensions 0.15 X 0.30. Includes Expansion of the Bathroom Sector Ceiling by G. 5,483,130.
- Provision and Placement of Machimbre on Metal Profiles. for G. 16,845,000.
- Provision and Placement of Thermoacoustic Insulation Type Isolant 10 Mm per G. 3,960,000.
- Ceramic Color Sheet Metal Ceiling Over Metal Profiles: by G. 17,355,000.
- Sheet Metal Gutters + Sheet Metal Downspouts by G. 2,343,150.
- Lateral Metal Nefas – Edge at the Ends of the Roof by G. 2,196,575.
- Sheet Metal Trestles on Ridge – Wide Development 60 Cm by G. 1,170,680.
- Provision and Placement of General Board With New Keys» for G. 521,000.
- Placement of Sectional Boards in Each Classroom + Bathroom» by G. 666.300.
- Power Circuits for Fans by G. 997.200.
- For Placement of (04 Point and Socket Units) + (08 Bass Socket Units)» by G. 1,372,800.
- Double Fluorescent Led Fixtures for the 02 Classrooms by G. 1,284,800.
- Double Fluorescent Led Fixtures for Sexed Bathrooms by G. 278,400.
- Individual Led Fluorescent Fixtures With Photocell for Gallery + Side Facades per G. 1,400,000.
- Ceiling Fans With Metal Boxes for G. 2,672,000.
- Provision + Placement of Metal Doors 0.80 X 2.10 Includes Hardware» for G. 4,080,800.
- Provision and Placement of (02) Ventiluz-Type Metal Openings Dimensions: 1.00 X 0.50 per G. 484.700.
- Provision and Placement of 4 Mm Transparent Glass – Glued With Putty by G. 1,559,250.
- General Interior / Exterior On All Walls. Includes Chained Concrete. for G. 14,148,000.
- Painting on Rendered Pillars in the Gallery Includes Capitals in Ceramic Color by G. 1,100,400.
- On Metal Openings (Doors + Windows) by G. 1,408,000.
- On Sheet Metal Gutters + Downspouts by G. 371.460.
- Painting on Machimbre de Madera in Classrooms + Gallery + Bathrooms by G. 6,427,500.
- Paint on Metal Ridge Beam 0.20 X 0.40 by G. 528,000.
- Painting on Metal Beam in Gallery 0.15 X 0.30 by G. 361.200.
- Construction of Slates With Wood Structure; Includes Side Frames and Holders. Painted in Green Color Base for Writing and With Varnish on the Edges + Holders for G. 2,240,000.
- Final Cleaning of Works for G. 988,000.
The aforementioned firm has Andres Amarilla and Gerardo Silveyra Mercado as legal representatives.
One more company came to the call: Rosana Mayumi Kasuga Miranda.
Source: DNCP