The Comptroller’s Office detects a loss of S/ 760,246 in the Chira Piura Project
The Institutional Control Body (OCI) of the Chira Special Project Piura (Pechp) identified an economic loss of S/ 760,246 in the rental of heavy machinery for drain clearing works in Bajo Chira,