In pursuit of the actions aimed at reducing electrical losses, the National Electricity Administration (ANDE), carried out last Wednesday, the verification and subsequent intervention of the electricity supply of a recycling plant of plastics, located in the city of Luque.
Read: Unfaithful employee admitted theft of G. 100 million, buried part of the money and spent a little
On the site was found a direct connection without meter in Medium Voltage with the aggravating circumstance of being a recurring practice of the user, whose consumption is presumed high due to the nature of the activity.
He supply is associated with NIS No. 1400851, which has an unpaid debt of G. 816,255,851, for electricity consumption and fines for previous fraud.
Once irregularity detectedthe ITV Technical Verification Report No. 65328 was drawn up and the user was made aware of the procedure, through Notification No. 43837.
The penalty fee resulting from the intervention amounts to G. 298,728,341 in various concepts contemplated in the Organic Charter of ANDE, Law 966/64.
Read More: They obtain images of the attack: hitmen shot without getting out of the car
Likewise, all these Background information was sent to the Public Ministry of the city of Luquewhere the criminal complaint for the Crime of Subtraction of Electric Power was filed.
This procedure was performed por technical officials of the Department of Interventions of the Division of Electrical Losses, dependent on the Commercial Management of ANDE.
The entrance Ande intervened in a plastic recycling plant by direct connection was first published on newspaper TODAY.