Today: December 27, 2024
March 2, 2022
1 min read

After failures in two lines, trains return to run in São Paulo

After failures in two lines, trains return to run in São Paulo

The circulation of trains on lines 8-Diamante and 9-Esmeralda, in the city of São Paulo, was normalized after the interruption caused in the early morning. According to ViaMobilidade, responsible for the management of the tracks, on Line 8-Diamante the trains circulated on a single track, causing reduced speed and longer intervals in the stretch. The failure occurred from 4 am to 7 am, due to a problem in the air network between Jandira and Barueri stations.After failures in two lines, trains return to run in São Paulo

On Line 9-Esmeralda, the interruption occurred due to a fire in external cables that cross the tracks in the region of Santo Amaro and João Dias stations, stopping circulation in the section between Santo Amaro and Granja Julieta, between 6:00 and 8:05.

According to ViaMobilidade, the Support Plan between Companies in Emergency Situations (Paese), which includes the use of buses, was activated to serve passengers and was canceled at 8:15 am.

The lines are part of the rail transport system that was the responsibility of Companhia Paulista de Trens Metropolitanos (CPTM) and started to be managed by ViaMobilidade in January of this year.

Source link

Latest Posts

They celebrated "Buenos Aires Coffee Day" with a tour of historic bars - Télam
Cum at clita latine. Tation nominavi quo id. An est possit adipiscing, error tation qualisque vel te.

Categories

Previous Story

“They are targeting me”: documentary filmmaker Jorge Said experienced a complex situation in the middle of the war zone in Ukraine

Petroleum Oriente with Ronaldo Sánchez, but without Facundo Suárez
Next Story

Petroleum Oriente with Ronaldo Sánchez, but without Facundo Suárez

Latest from Blog

Go toTop