Today: December 27, 2024
June 19, 2022
1 min read

Deputies allocate 118 million pesos to repairs in San Lázaro

Foto

▲ The Legislative Palace has suffered from earthquakes and the passage of time.Photo Roberto Garcia Ortiz

Georgina Saldierna

Newspaper La Jornada
Saturday June 18, 2022, p. 4

In the past seven months, the administration committee of the Chamber of Deputies has approved resources for 118.8 million pesos to rehabilitate the facades of buildings C, G and I, as well as to remove the trees with pests that exist in the gardens of San Lázaro and improve the Internet network.

All of this is part of an extensive program of repairs that is carried out in the Legislative Palace, affected by earthquakes and the passage of time.

For the rehabilitation of the facade of building I, the committee allocated 90 million pesos last December. The agreement explains that it is urgent to replace the face of the building made with aluminum panels known as Alucobond, because it has reached the end of its useful life due to the years that have passed and the lack of maintenance.

Also at the end of last year, resources were approved for 21.2 million pesos for the acquisition and installation of fiber optics, switches and equipment for the redistribution of Internet network traffic.

The document endorsed by the deputies who are members of the committee indicates that San Lázaro currently has a voice and data network that requires increasing its availability and performance in order to attend to the new ways of operating derived from the covid-19 pandemic, since the date is made up of lower performance infrastructure, such as copper cables that limit the transfer speed and, consequently, the transmission of videoconferences and remote services.

Last March, the administrative body authorized the signing of a collaboration agreement with the UNAM Biology Institute for the removal and clearing of declining or dead trees in the chamber’s gardens. For this purpose, 3.6 million pesos will be available.

The agreement notes that trees in declining and dead conditions were already identified in a previous study. They must be removed because they represent a potential risk in terms of civil protection and are species that can spread diseases among healthy vegetation.

To the rehabilitation of the facades of buildings C and G, with the installation of a thermal finishing system, 4 million pesos will be channeled, says the administration committee.

Source link

Latest Posts

They celebrated "Buenos Aires Coffee Day" with a tour of historic bars - Télam
Cum at clita latine. Tation nominavi quo id. An est possit adipiscing, error tation qualisque vel te.

Categories

Lluvias que caen sobre Nicaragua tienen 90% de probabilidades de volverse ciclón
Previous Story

More rains are forecast in Nicaragua due to the entry of two tropical waves

Yoan Moncada y José Abreu intercambian en un partido de los White Sox). Foto: Tomada de MLB.
Next Story

MLB in the seventh: rewriting history

Latest from Blog

GNB destroyed base of the Felix San Mateo gang

GNB destroyed base of the Felix San Mateo gang

A logistics base of the criminal group Félix San Mateo was detected and destroyed by agents of the Bolivarian National Guard (GNB), according to military reports. The procedure was carried out in
Judicial electoral process begins in CDMX

Judicial electoral process begins in CDMX

The presiding counselor, Patricia Avendaño Durán, stressed that the election of the local Judiciary will be much larger than the last electoral process and must be organized in significantly less time. He
Go toTop