The company V – Engineering SA was awarded for G. 600,000,000
In the course of the morning, the DNCP published that the company V – Engineering SA was awarded for a total value of G. 600,000,000, managed to win the tender of Lco N ° 01-2022 «Building Maintenance and Repair Service with the ID 405,505. For this tender, offers began to be received on Wednesday, February 23, 2022.
The Ministry of the Environment and Sustainable Development (MADES) was the institution in charge of carrying out the Call for Tenders No. 405,505 under the category of Cleaning Services, Maintenance and Minor and Major Repairs of Installations, Machinery and Vehiclesby the type of Bid Contest procedure.
The aforementioned institution awarded 40 items.
Demolition (At the Headquarters of Mades Up to 100Km) by G. 23,708.
Masonry (At the Headquarters of Mades Up to 100Km) by G. 248.051.
Reinforced Concrete (At the Headquarters of Mades Up to 100Km) for G. 1,522,643.
Building Installations (In the Headquarters of the Mades Up to 100Km) for G. 1,474,719.
Sanitary Facilities (In the Headquarters of the Mades Up to 100Km) by G. 405.166.
Maintenance and Repair of Openings (At the Headquarters of the Mades Up to 100Km) for G. 1,158,504.
Exterior Painting (Labor and Materials) (At the Headquarters of Mades Up to 100Km) by G. 110.255.
Interior Painting (Workforce and Materials) (At the Headquarters of Mades Up to 100Km) by G. 53.057.
Electrical Installations (In the Headquarters of Mades Up to 100Km) by G. 8,489,711.
Maintenance and Repair of Signs (At the Headquarters of the Mades Up to 100Km) for G. 41,008,750.
Demolition (Cost From 100.1 Km To 250 Km) for G. 25,356.
Masonry (Cost From 100.1 Km To 250 Km) for G. 261,281.
Reinforced Concrete (Cost From 100.1 Km To 250 Km) for G. 1,603,901.
Building Installations (Cost From 100.1 Km To 250 Km) for G. 1,553,470.
Sanitary Facilities (Cost From 100.1 Km To 250 Km) for G. 426,796.
Maintenance and Repair of Openings (Cost From 100.1 Km to 250 Km) for G. 1,219,958.
Exterior Painting (Labor and Materials) (Cost From 100.1 Km To 250 Km) for G. 116,137.
Interior Painting (Labor and Materials) (Cost From 100.1 Km to 250 Km) for G. 55,888.
Electrical Installations (Cost From 100.1 Km To 250 Km) for G. 8,943,440.
Maintenance and Repair of Billboards (Cost From 100.1 Km to 250 Km) by G. 54,296,189.
Demolition (Cost From 250.1 Km To 400 Km) for G. 26,481.
Masonry (Cost From 250.1 Km To 400 Km) for G. 277,003.
Reinforced Concrete (Cost From 250.1 Km to 400 Km) for G. 1,700,657.
Building Installations (Cost From 250.1 Km to 400 Km) for G. 1,647,239.
Sanitary Facilities (Cost From 250.1 Km To 400 Km) for G. 452,537.
Maintenance and Repair of Openings (Cost From 250.1 Km to 400 Km) for G. 1,292,557.
Exterior Painting (Labor and Materials) (Cost From 250.1 Km to 400 Km) for G. 123,112.
Interior Painting (Labor and Materials) (Cost From 250.1 Km to 400 Km) for G. 59,255.
Electrical Installations (Cost From 250.1 Km To 400 Km) for G. 9,483,615.
Maintenance and Repair of Billboards (Cost From 250.1 Km to 400 Km) for G. 66,530,000.
Demolition (Cost From 400.1 Km To 550 Km) for G. 28,369.
Masonry (Cost From 400.1 Km To 550 Km) for G. 296,830.
Reinforced Concrete (Cost From 400.1 Km to 550 Km) for G. 1,822,047.
Building Installations (Cost From 400.1 Km to 550 Km) for G. 1,764,650.
Sanitary Facilities (Cost From 400.1 Km To 550 Km) for G. 484,831.
Maintenance and Repair of Openings (Cost From 400.1 Km to 550 Km) for G. 1,386,678.
Exterior Painting (Labor and Materials) (Cost From 400.1 Km to 550 Km) for G. 131,943.
Interior Painting (Labor and Materials) (Cost From 400.1 Km to 550 Km) for G. 63,487.
Electrical Installations (Cost From 400.1 Km To 550 Km) by G. 10,158,403.
Maintenance and Repair of Billboards (Cost From 400.1 Km to 550 Km) by G. 80,452,501.
The aforementioned firm has Adolfo Vera Alderete and Juan Manuel Vera Campuzano as legal representatives.
Brazil reached, in the second quarter of 2025, the smallest number of people unemployed for over a year ever registered. The record is in the National Continuous Household Sample Survey (Continuous PNAD),
The External uncertaintyderived largely by the tariff policy promoted by Donald Trump, president of the United States; The acute fiscal crisis that Colombia is going through and the beginning of the presidential
The citizen complaint attributes part of the deterioration of food products to the “constant cuts of electricity.” Miami, United States. – A citizen complaint Published by the journalist Mario J. Pentón It
He United States Department of Agriculture (USDA) will allocate up to 750 million dollars to build a production plant of sterile flies In Texas to combat the plague of New World Barrencador
Dina Boluarte He arrived at the Chinería Island accompanied by the president of Congress, José Jerí. The president arrived in the Loreto area that, in recent days, has been the focus of