The company Luis Antonio González Salinas was awarded by G. 133,710,227
During the afternoon, the DNCP published that the company Luis Antonio González Salinas was awarded for a total value of G. 133,710,227, and managed to win the tender for the Construction of the Bas Carlos A Lopez Informatica Classroom with the ID 413,232. For this tender, offers began to be received on Friday, April 1, 2022.
Municipality of Carmelo Peralta was the institution in charge of carrying out the Call for Tenders No. 413,232 under the category of Construction, Restoration, Reconstruction OR Remodeling and Repair of Real Estateby the type of Direct Contracting procedure.
The aforementioned institution awarded 57 items.
A- Cleaning and Preparation of the Land by G. 1,035,640.
B- Stakeout by G. 723.425.
Excavation and Loading of Pbc Foundation. by G. 1,204,140.
A- Chained from H°A° 0.13 X 0.27 by G. 6,144,000.
B- Beams and Dice of H° A°; of 0.15 X 0.40 for G. 3,024,000.
C- Tile of H°A° Over Access Door by G. 784.120.
A- Leveling Wall of 0.45 Cms, for Elevation Walls of 0.30 by G. 1,740,000.
B- Leveling Wall of 0.30 Cms, for Elevation Walls of 0.15 by G. 440.986.
C- Leveling Wall of 0.60 Cms. for Pillars for G. 156,000.
Filling and Tamping of Interiors for G. 1,512,000.
A-Asphaltic Insulation of Walls by G. 216.580.
C-Elevation Wall of 0.30 to Revoke for G. 2,769,200.
A- Elevation Wall of 0.15 to Revoke by G. 421.084.
B- Elevation Wall of 0.30 Seen Both Sides of Solid Semi-Pressed Bricks by G. 9.254.400.
D- Rods Under Openings 2 Ø 8 Per Course (2 Courses) by G. 671.882.
A- Pillar of 0.30 X 0.30 to revoke by G. 638.400.
B- 0.45 X 0.45 Visible Pillar for Corridor of Solid Semi-Pressed Bricks by G. 947.232.
A- Roof Tiles With Machine-Pressed Tejuelones and 2″ X 6″ Hº Aº Braces With 1 ½” X 3″ Groove Strip for G. 24,360,000.
A- Plaster of Interior and Exterior Walls One Layer for G. 2,240,000.
B- Plaster of Pillars 0.30 X 0.30 Mts. by G. 196,291.
C- Plaster of Ridge Beam and H° A° Gallery by G. 644.754.
Subfloor of H° de Cascotes 10 Cms. by G. 3,005,553.
Granite Floor Polished Gray Base 30 X 30 Cms. for G. 9,648,000.
Base Granite Base Polished Gray 10 X 30 Cms. by G. 1,208,880.
A- Metallic Door of 1.20 X 2.10 With Frame and Hardware for G. 1,080,000.
B- Balance Windows of 1.50 X 1.68 Mts. by G. 8,467,200.
A- Mochetas plaster 1: 3 (Cement – Sand) by G. 808.928.
B- Sill of Semi-Pressed Solid Bricks Type Sardinel by G. 251.712.
A- Lime-Based Wall Painting for Latex (2 Coats and Sanding) by G. 1.653.968.
B- Painting of Walls and Pillars Plastered Al Latex by G. 2.324.640.
C- Painting of Visible Pillars With Colorless Anti-mould (Cleaning of Visible Bricks With Muriatic Acid and Patinal D) by G. 372.232.
D- Painting of Ridge Beam and Al Latex Gallery by G. 449.972.
E- Painting of Seesaws With Synthetic Paint by G. 580.991.
F- Painting of Exposed Bricks With Colorless Anti-mould (Cleaning of Exposed Bricks With Muriatic Acid and Patinal D) by G. 2,765,347.
G- Painting of Tejuelones With Varnish by G. 3.953.792.
H- Metallic Door Paint With Synthetic Paint for G. 231.000.
I- Paint of H° A° Al Latex Tie Rods and Strip by G. 2.472.300.
J- Paint Gutter and Downspout With Synthetic Paint for G. 1,610,000.
4 Mm Double Glasses. by G. 1,587,600.
A- Canaleta and Caño de Bajada 26 – Development 40 Cms. for G. 2,300,000.
Save Cement Smoothing Works With Subfloor for G. 1,575,000.
Installation of the Ts10 Board of 10 Ag. for G. 2,691,000.
Installation of Control Panels Tc for G. 2,553,000.
Installation of Tcv Fan Control Panels for G. 1,400,000.
Supply of the Light Circuits for G. 1,980,000.
Feeding of the Outlet Circuits by G. 1,320,000.
Supply of Fan Circuits by G. 1,317,440.
Feeding of Computer Socket Circuits by G. 6.193.440.
Feed 2 X 6 Mm. To the Existing Board for G. 4,508,000.
3 X 40 W Fluorescent Fixtures by G. 739.680.
Fluorescent Fixtures 1 X 40 WC / Photocell in Gallery by G. 246.560.
Ts 10 Board of 10 Ag. With Phase and Neutral Bar for G. 179.400.
Tc board of 6 Ag. for G. 188.600.
Tcv Board for 4 Fan Keys by G. 173.880.
Electrical Register of 30 X 30 X 70 Cms. by G. 1,015,680.
Pedestrian ramp by G. 1.600.097.
Final cleaning by G. 2,132,201.
The aforementioned firm has Luis Antonio González Salinas as its legal representative.
Two more companies came to the call: Kathya Vanessa Irigoyen Centurion and Roger Abel Nuñez Benitez.
l to crisis in the Corn production in Mexico in 2024 highlights the fragility of obtaining food in an environment of climate crisis. It is expected that only 23.4 million tons of
In an emotional ceremony, approximately 95 prisoners from the ‘Cecilia Orillac de Chiari’ Women’s Rehabilitation Center (CEFERE), received from the authorities of the Ministry of Education their certificate of completion of studies
The Provincial Prosecutor’s Office Specialized in Environmental Matters of Sullana opened this Sunday, December 22, 2024, a preliminary investigation against the company Petroperú for the alleged commission of the crime of environmental
Japanese car companies nissan engine and honda motor They began negotiations this Monday for their merger that they hope to conclude in June 2025, with the holding company going public in August
The Venezuelan Government built, on the border with Guayana Esequiba, a comprehensive rural school and a type I outpatient clinic, intended to improve social care for the local population. Last Thursday, Venezuela