The Minister of Transport and Public Works, José Luis Falero, said that the planned investment in the five-year period for road infrastructure will go from “less to more” until 2024
Source link
Falero: the works on route 5, the double track to Rocha, the tunnels in the interbalnearia and the plan of the 100 radars
Latest from Blog
Treasury pays R$257.7 million in state and municipal debts in January
The Union paid R$257.73 million in late debts from states and municipalities in January this year, according to the Report on Guarantees Honored by the Union in Credit Operations and Recovery of
Yura López: “Acting has helped me live better”
The acting qualities of actress Yura López (Villa Clara, 1985) have not gone unnoticed by directors, nor by the public who has followed her work in theater, radio, film and television. Graduated
Ferrer says a US coup should take out Cuba’s Díaz-Canel and Alejandro Castro
Miami/Former Cuban political prisoner José Daniel Ferrer said that a United States coup against Cuba like the one dealt to the Government of Venezuela last January should “remove from power” President Miguel
José María Balcázar LIVE: president arrived at the Government Palace amid questions from Congress
The president José María Balcázar He was elected amid questions about his statements on child marriage. From Congress, the Renovación Popular and Fuerza Popular benches face each other after their election. José
Digital port in the DR will allow connecting with the US and increasing internet capacity
The digital exchange port for international underwater connectivity will be made up of two cables that will connect the Dominican Republic with the United States. The information was released this Thursday Christian
