The Reinaldo Blanco Aquino company was awarded for G. 154,299,580
In the course of the morning, the DNCP published that the company Reinaldo Blanco Aquino was awarded for a total value of G. 154,299,580, managed to win the tender for the Construction of Fences, Lighting, Various Repairs in the Municipal Plaza San José Obrero with the ID 407,547. For this tender, offers began to be received on Wednesday, March 2, 2022.
Departmental Government of Cordillera (CORDILLERA) was the institution in charge of carrying out the Call for Tenders No. 407,547 under the category of Construction, Restoration, Reconstruction OR Remodeling and Repair of Real Estateby the type of Direct Contracting procedure.
The aforementioned institution awarded 49 items.
Provision and Placement of Work Poster for G. 1,400,000.
Marking and Layout for G. 1,000,000.
Hard Soil Excavation for Pbc Foundation for G. 2,171,000.
Foundation of Pbc 40X40 by G. 6.162.750.
Leveling masonry 0.30M by G. 5,430,750.
Plaster With Water-Repellent Masonry Leveling by G. 1,948,800.
Tile of H° 0.30X0.30 H=10 Cm. Galvanized Post Base, Includes Hard Soil Excavation for G. 1,428,000.
Solid Galvanized Posts by G. 1,870,000.
Provision and Placement of 2″ Galvanized Posts, Wall 1.80Mm. Height 5.00M Counted From the Leveling Masonry Coping to the Upper End of the Post. Distance Between Post Axes (See Plan) by G. 24,140,000.
Provision and Placement of 2″ Galvanized Posts, 1.80mm Wall, Welded Horizontally Between the Vertical Posts (Measures According to Plan) for G. 16,000,000.
Provision and Placement of Smooth Galvanized Wire. Includes the Lower, Intermediate and Upper Moorings of the Fabric To the Posts. by G. 1,030,080.
Provision and Placement of Wire Mesh, 2″ Metal Mesh of 5.00M in Height for G. 6,032,000.
Demolition of Existing Poles for G. 2,490,000.
Demolition of Electrical Installation: Lighting Fixtures, Boards. for G. 1,000,000.
Underground Power Supply Nyy 4X10 Cable to Measurement Post and Main Board. for G. 2,750,000.
Power Supply for Underground Electrical Devices: Includes Tm Keys for Tp and Wiring (Cable Nyy 4X4Mm) for G. 5,250,000.
Supply and Installation of Main Board with Thermomagnetic Keys for G. 1,120,000.
Verification Record 15X15Cm Sealed (Each Base) for G. 1,200,000.
Supply and Placement of Hpit Type Reflectors: 400W With Power From the Tp, 2 Fixtures For Each Tower – Hº Column of 9M/159Kgf) for G. 21,600,000.
Supply and Installation of Led Spotlights for Exterior Lighting for G. 540,000.
Provision and Placement of Banks for G. 9,000,000.
Marking and Layout for G. 216,000.
Demolition of Electrical Installation: Lighting Fixtures, Fans, Boards. for G. 1,000,000.
Demolition of Interior Floors for G. 379,500.
Demolition of Exterior Floors (roadways) for G. 1,607,500.
Demolition of Zocalos for G. 165,000.
Plaster Demuros One Layer With Filtered Water-repellent (Exterior) for G. 2,520,000.
Various Interior Plaster Repairs for G. 1,030,000.
Subfloor of H ° of Rubble of 10Cm. by G. 3,847,500.
Base Smoothed Carpet for Ceramic Floor Seat. by G. 569,250.
Provision and Installation of Non-slip Pei 5 Glazed Ceramic Floor. by G. 1,707,750.
Provision and Placement of Glazed Ceramic Baseboard. Same Floor Material. for G. 495,000.
Provision and Installation of a 40X40 Hº Tile Floor for G. 8,359,000.
Feeding of Main Board for G. 1,600,000.
Food, Supply and Placement of Control Panel for Tcv Fans for G. 950,000.
Supply and Installation of 20 Ag Main Board with Phase and Neutral Bar for G. 1,250,000.
Supply of the Lighting Circuits for G. 1,485,000.
Feeding of the Outlet Circuits for G. 540,000.
Supply of Fan Circuits per G. 135,000.
Fluorescent fixtures of 3 X 40 W for G. 500,000.
1 X 40 WC Fluorescent Fixtures/ Photocell in Gallery and Exteriors With Unipolar On/Off Switch. for G. 1,170,000.
Provision and Installation of Led Spotlights for Exterior Lighting for G. 120,000.
Latex Paint (Two Hands) by G. 4,146,000.
Ceiling Painting: Tejuelones Al Varnish and Suspenders and Wood Beams Al Synthetic by G. 1,643,500.
Painting of Metallic/Wood Doors Al Synthetic by G. 798.000.
Painting of Rocker Arms Al Synthetic by G. 88.200.
Gutter and Downspout Paint With Synthetic Paint. for G. 1,064,000.
Maintenance and Cleaning of Sanitary Appliances and Cleaning of Tiles for G. 2,000,000.
Final Cleaning and Debris Removal for G. 1,350,000.
The aforementioned firm has Reinaldo Blanco Aquino as its legal representative.
One more company came to the call: Candido Ramon Villalba Caballero.
The Secretariat of Security and Citizen Protection explained that the four subjects were arrested in the middle of Christmas, in possession of long firearms, chargers, cartridges, a machine gun and five vehicles.
Petroperu announced that it will hold meetings with all parties after the oil spill on ‘Las Capullanas’ beach, in Piurawhich has affected the ecosystem and caused the death of marine animals. Legislative
The report released by the Federal Reserve to explain its decision to lower rates for the third time this year will make the Dominican Central Bank much more cautious in reducing its
The extreme right leader Henry Ramos Allup said that the opposition to the government must leave behind the chapter of the defunct National Assembly of 2015, an instance sponsored by destabilizing interests
The governor of Rio de Janeiro, Cláudio Castro, criticized the decree of the Ministry of Justice and Public Security that creates rules for the use of force by police officers across the