During the morning, the DNCP published that the company Holler Ingeniería SRL was awarded for a total value of G. 160,000,000, and managed to win the bid for Preventive and Corrective Maintenance of Atlas Mdn Elevators with ID 406,327. For this tender, offers began to be received on Friday, February 18, 2022.
National Directorate of Civil Aeronautics (DINAC) was the institution in charge of carrying out the Call for Tenders No. 406,327 under the category of Cleaning Services, Maintenance and Minor and Major Repairs of Installations, Machinery and Vehiclesby the type of Direct Contracting procedure.
The aforementioned institution awarded 128 items.
- Inspection, Cleaning of Electrical Mechanisms in the Engine Room for G. 387,000.
- Inspection, Lubrication and Cleaning of Mechanical Mechanisms in the Engine Room for G. 166,500.
- Inspection, Cleaning and Lubrication of Mechanisms Inside the Elevator Shaft for G. 198,000.
- Inspection, Cleaning, Lubrication and Adjustment (Plunger, Canvas, Joints) for G. 225,000.
- Cleaning and Lubrication Inspection of Electromechanical Mechanisms in the Cabin for G. 180,000.
- Cleaning and Lubrication Inspection of Floor Door Mechanisms for G. 72,000.
- Change of 1/2″ Traction Steel Rope for G. 63.964.
- Labor for the Change of the Traction Steel Ropes for G. 6,873,750.
- 1/2″ Steel Cable for Speed Regulator by G. 63.979.
- Labor for the Change of the Steel Cables of the Speed Regulator by G. 1,101,563.
- Spring for Change and Shortening of Rope Tensioners by G. 675.638.
- Labor for the Change of Spring for Rope Tensioner by G. 101.813.
- Labor for the Shortening of Traction Ropes by G. 871.782.
- Supplies for the Repair of Floor Door Leaf by G. 169.088.
- Labor for the Repair of the Floor Door Leaf by G. 649.875.
- Supplies for the Repair of Door Trolley by G. 650,719.
- Labor for Door Trolley Repair per G. 305.625.
- Rubber Profile for Door Leaf by G. 145.407.
- Labor for the Change of the Rubber Profile for the Door Leaf for G. 35,250.
- Cabin flooring for G. 930,600.
- Labor for the Change of the Floor of the Cabin for G. 282,000.
- Bushing for Door Arm by G. 110.685.
- Labor for the Change of the Door Arm Bushing by G. 44.063.
- Supplies for the Rectification of the Regulator Pulley (Parachute) by G. 392.157.
- Labor Regulator Pulley Rectification (Parachute) by G. 435.844.
- Special Bushing for Gate Operator by G. 317.250.
- Labor for the Change of the Special Bushing for the Door Operator by G. 111.038.
- Rubber Support for APC Reducer by G. 189.469.
- Labor for the Change of the Rubber Support for APC by G. 110.157.
- Set of Exciter Motor Bearings by G. 597.488.
- Labor for Exciter Motor Bearing Set Change by G. 286.407.
- Machine Motor Bearing Set by G. 601.894.
- Labor for the Change of Game of Machine Bearings by G. 491.738.
- Motor Generator Bearing Set by G. 1.272.525.
- Labor for the Change of the Motor Generator Bearings by G. 666.225.
- Labor for the Rectification of Machine Pulley Sets by G. 2,591,757.
- Labor for the Rectification of the Crown and Worm Machine Motor by G. 9,123,582.
- Labor for the Rectification of Deviation Pulleys by G. 2,132,625.
- Carbon Broom for Generator Motor Mg 45 by G. 151.840.
- Labor for the Change of Carbon Broom for Mg45 Generator Motor for G. 31,725.
- Exciter Motor Coal Broom by G. 151.840.
- Labor for the Change of Carbon Broom for Exciter Motor for G. 31,725.
- Machine Engine Carbon Broom by G. 151.840.
- Labor for the Change of Carbon Broom for Machine Motor for G. 31,725.
- Graphitized Copper Contact for Contactors by G. 182.419.
- Labor for the Change of Graphitized Copper Contacts for Contactors by G. 31,725.
- Command and Selector Relay Coil by G. 1.024.500.
- Labor for the Change of the Command and Selector Relay Coil by G. 378.938.
- Command and Selector Panel Relay by G. 2.367.626.
- Labor for Change of Relay of Control Board and Selector by G. 378.938.
- Contactor Coil by G. 473.055.
- Labor to change the contactor coil for G. 105,750.
- Plastic Cabin Guides and Counterweight by G. 182.043.
- Labor for the Change of Plastic Cabin Guides and Counterweight for G. 127,782.
- Numbered Command Panel Buttons and Position Indicator per G. 109.275.
- Labor for the Change of Numbered Buttons of the Command Panel and Position Indicator by G. 30.844.
- Call Protection by G. 8.989.
- Labor for the Change of Call Protection by G. 22.032.
- Supplies for the Corrective Repair of the Mobile Ramp and Its Rulemanes by G. 462.289.
- Labor for the Corrective Repair of the Mobile Ramp and the Change of Its Rulemanes for G. 296,100.
- Supplies for the Rectification of Electromechanical Brake Kits by G. 370.125.
- Labor for the Revision, Rectification and Calibration of Cabin Doors by G. 1,213,658.
- Workforce Rectification of Electromechanical Brake Set by G. 1.449.245.
- Brake Fiber by G. 950.481.
- Labor for the Change of Brake Fibers by G. 220,313.
- Special Oil for Machine by G. 68.421.
- Labor for the Change of Special Oil for Machine by G. 308.438.
- Door Motor Crown and Shaft by G. 663.875.
- Labor for the Change of the Crown and Shaft of the Door Motor by G. 313.725.
- Rubber Damper for Door Motor Chain by G. 34.263.
- Labor for the Change of the Rubber Damper for the Door Motor Chain for G. 48,469.
- Change of the Door Operator Chain by G. 509.363.
- Belt for Mg45 by G. 188.235.
- Labor for the Change of Belt for Mg45 by G. 48.469.
- Labor for Repair of Coal Holder for Mg45 for G. 938,520.
- Selector Belt by G. 327.825.
- Labor for the Change of the Selector Belt by G. 3,789,375.
- Plastic Guide for Sorting Belt by G. 31.926.
- Labor for the Change of Plastic Guide for Sorting Belt by G. 13.219.
- Spring for Pick-Up by G. 28.024.
- Labor for the Change of Pick Up Spring by G. 48,469.
- Nylon Bushing for Pick Up by G. 49.491.
- Labor for the Change of Nylon Bushing for Pick Up by G. 22.032.
- Steel Rope for Sorting Belt by G. 31.725.
- Labor for the Change of the Steel Rope for Selector Belt by G. 304.032.
- Door Motor Rewind by G. 771.387.
- Labor for the Disassembly and Assembly of the Door Motor by G. 189.469.
- Rewinding of Step-Up Voltage Transformer by G. 2,447,525.
- Labor for the Disassembly and Assembly of the Transformer by G. 48.469.
- Rewinding of the Generator Motor by G. 13.982.501.
- Labor for the Cleaning of Collector Thinnings and Mica Spaces by G. 1,145,625.
- Starting Resistance by G. 3,033,380.
- Labor for the Change of the Starting Resistance by G. 220,313.
- Tubular Resistance by G. 945.405.
- Labor for the Change of Tubular Resistance by G. 110.157.
- Thermomagnetic switch 10 Amp. by G. 135,149.
- Labor for the Change of Thermomagnetic Switch by G. 48.469.
- Electronic Protection Barrier by G. 2,361,750.
- Labor for the Change of Electronic Protection Barrier by G. 660.938.
- Cabin Fan by G. 868.325.
- Labor for the Change of Fan for Cabin by G. 220.313.
- Lower Guide for Door Leaf by G. 19.740.
- Labor for the Change of the Lower Door Guide by G. 13.219.
- Micro Breaker for Lpa and Lpf by G. 286.407.
- Labor for the Change of Microswitch Lpa and Lpf by G. 110.157.
- Hydraulic Pump for Cabin Door by G. 3.308.859.
- Labor for the Change of Hydraulic Pump for Cabin Door by G. 308.438.
- Bayonet Type Lamp 12V – 12W by G. 7.121.
- Labor for the Change of Bayonet Type Lamp 12V – 12W by G. 13.219.
- Lamp 220V – 40 W for Gong by G. 19.388.
- Labor for Lamp Change 220V – 40 W 99For Gong by G. 22.032.
- Buzzer for 220V Alarm by G. 401.850.
- Flexible Command Cable of 8 and 9 Wires by G. 133.245.
- Labor for the Change of Flexible Command Cable of 8 and 9 Threads by G. 1,916,719.
- Maneuver Door Driver Inside the Cabin With Key by G. 285.525.
- Labor Installation of the Maneuver Door Closer by G. 44.063.
- Change of Floor Door Hook for G. 191.525.
- Electronic Door Barrier Cable by G. 329.235.
- Labor for the Change of Electronic Gate Barrier Cable by G. 48.469.
- Repair of Electronic Board of Command Panel by G. 712.638.
- Cabin Lighting Lamp by G. 26.438.
- Labor for the Change of the Cabin Lighting Lamp by G. 13,219.
- Change of Brake Disc of the Machine by G. 8.277.522.
- Change of Power Cables 16Mm Per Meter for G. 68,738.
- Digital Cabin Position Indicator by G. 1.187.573.
- Labor Installation of Digital Indicator in the Cabin by G. 334.875.
- Digital Floor Position Indicator for G. 1,294,762.
- Labor for Installation of Digital Position Indicator for Floor by G. 334.875.
The aforementioned firm has Federico Juan Holler as its legal representative.
Three more companies appeared at the call: Inelec Sa, Renfe Sa and Simon Recalde Romero.
Source: DNCP