The company Aldo Bogado Casco was awarded for G. 175,900,100
During the morning, the DNCP published that the company Aldo Bogado Casco was awarded for a total value of G. 175,900,100, and managed to win the tender for Municipal Machinery Rep. with ID 406,013. For this tender, offers began to be received on Monday, February 21, 2022.
Municipality of Coronel Oviedo was the institution in charge of carrying out the Call for Tenders No. 406,013 under the category of Cleaning Services, Maintenance and Minor and Major Repairs of Installations, Machinery and Vehiclesby the type of Direct Contracting procedure.
The aforementioned institution awarded 77 items.
Provision and Placement of Mass Ruleman for G. 2,500,000.
Provision and Placement of Mass Retainer for G. 840,000.
Provision and Placement of Ruleman Insurance for G. 425,000.
Labor for Repair of Rear Mass for G. 1,400,000.
Provision and Placement of Cylinder Repair for G. 295,500.
Labor for repair of Cachamba cylinder and Limiter for G. 1,350,000.
Provision and Placement of Filters for G. 862,500.
Supply and Placement of 15W40 Motor Oil for G. 700,000.
Provision and Placement of Oil for Box and Differential for G. 420,000.
Provision and Placement of 180A Battery for G. 1,450,000.
Labor for General Maintenance of Engine, Box and Differential for G. 4,800,000.
Provision and Placement of Differential Loaded Pot Kits for G. 800,000.
Labor for Differential Repair for G. 2,230,000.
Provision and Placement of Clutch Kits for G. 500,000.
Labor for Clutch Repair for G. 900,000.
Provision and Placement of Maso Elastico for G. 3,200,000.
Labor for Elastic Repair per G. 600,000.
Provision and Installation of Rear Mass and Shaft for G. 3,650,000.
Labor for Mass Repair per G. 2,500,000.
Provision and Placement of Toe Caps for G. 6,156,000.
Provision and Placement of Rear Toe Corner for G. 1,260,000.
Supply and Placement of Cardan Bridle Retainer for G. 380,000.
Provision and Placement of Sheets for G. 7,609,500.
Labor for Front Shovel and Bucket Repair for G. 5,500,000.
Provision and Placement of Filters for G. 1,305,000.
Supply and Placement of 15W40 Engine Oil for G. 490,000.
Supply and Installation of Transmission Oil 50 for G. 765,000.
Provision and Placement of Hydraulic Oil 68 for G. 3,392,000.
Provision and Placement of 110A Battery for G. 1,250,100.
Labor for General Maintenance of Engine, Transmission and Hydraulic System for G. 2,500,000.
Provision and Placement of Horn Button for G. 60,000.
Provision and Placement of Cable, Terminal and Sheet for G. 140,000.
Labor for Repair of Electrical Part for G. 650,000.
Provision and Placement of Toe Caps With Bolts for G. 6,480,000.
Provision and Placement of Transmission Flange Seal for G. 393,500.
Provision and Placement of Various Bushings and Shims for G. 2,800,000.
Labor for Front Shovel Repair for G. 4,700,000.
Provision and Placement of Filters for G. 2,306,500.
Supply and Placement of 15W40 Engine Oil for G. 595,000.
Supply and Installation of Transmission Oil 50 for G. 900,000.
Provision and Placement of Hydraulic Oil 68 for G. 2,560,000.
Provision and Placement of Oil for Front and Rear Differential 80W140 for G. 1,176,000.
Labor for General Maintenance of Engine, Transmission and Hydraulic System for G. 2,500,000.
Provision and Placement of Ac Hose for G. 720,000.
Provision and Installation of Cabin Filter for G. 450,000.
Labor for AC Repair and Gas Charge for G. 630,000.
Provision and Placement of Centralizer and Cardan Support for G. 912,000.
Provision and Placement of Cardan Flange and Cardan Cross for G. 1,429,500.
Provision and Placement of Tunnel Seal and Cardan Bridle Seal for G. 417,000.
Provision and Placement of Tunnel Seal and Cardan Bridle Seal for G. 654,000.
Provision and Placement of Filters for G. 412,000.
Supply and Placement of 15W40 Engine Oil for G. 210,000.
Provision and Placement of Oil for Box and Differential for G. 420,000.
Provision and Placement of Belts for G. 309,000.
Labor for General Maintenance of Engine, Box and Differential for G. 150,000.
Provision and Placement of Brake Cylinder for G. 1,968,000.
Provision and Placement of Central Pump and Brake Hose for G. 1,044,000.
Provision and Placement of Brake Fluid for G. 105,000.
Labor for Brake Repair for G. 400,000.
Provision and Placement of Spotlights for G. 84,000.
Provision and Placement of Signal Lighthouses for G. 580,500.
Provision and Placement of Relay and Plug for G. 72,000.
Labor for Repair of Electrical Part for G. 550,000.
Provision and Installation of Blade with Nuts and Bolts for G. 8,166,000.
Provision and Placement of Corner for G. 5,324,000.
Provision and Placement of Chocks for G. 3,397,500.
Provision and Placement of Piñon With Hydromotor for G. 13,000,000.
Labor for Repair of Tornameza and Blade Guide for G. 15,200,000.
Provision and Placement of Filters for G. 3,303,000.
Supply and Placement of 15W40 Engine Oil for G. 810,000.
Provision and Placement of Oil for Transmission and Differential 50 for G. 2,700,000.
Provision and Placement of Tandem Oil Both Sides for G. 9,000,000.
Labor for General Maintenance of Engine, Transmission and Hydraulic System for G. 2,800,000.
Provision and Placement of Compressor for G. 9,832,000.
Provision and Placement of Filters for G. 2,499,000.
Repair of Caño de Ac for G. 560,000.
Labor for Air Conditioning Repair for G. 2,500,000.
The aforementioned firm’s legal representative is Aldo Bogado Casco.
Aldo Bogado Casco was the only company that submitted to the call.
Attention. The Executive announced this Tuesday night to expand the state of emergency for 45 more days in the 14 districts where this measure was in force. The districts that will remain
Your Town and its Origin “My mother made the sweet as a dessert to toast some agronomists who came to eat at the house, who were guests of my father, but then
Orsi met with former President Mujica and former Vice President Topolansky The elected president of Uruguay, Yamandú Orsi, recently met with former president José Mujica at the Rincón del Cerro farm. The
This Tuesday the National Assembly approved an agreement in repudiation of the illegitimate and illegal unilateral coercive measures imposed by the United States against Nicaragua. The project “Agreement in Repudiation of the
Botafogowith a goal from Venezuelan Jefferson Savarino, beat 1-3 Palmeirasregained the lead alone and took a giant step towards winning the League title, with two days left in the championship. Gregore, in