The company Ricardo Andres González Ortiz was awarded for G. 168,000,000
In the course of the morning, the DNCP published that the company Ricardo Andres González Ortiz was awarded for a total value of G. 168,000,000, managed to win the tender for the Maintenance and Repair of Air Conditioning Equipment of the Hall Publicó of the Aig with the ID 405,291. For this tender, offers began to be received on Wednesday, January 26, 2022.
National Directorate of Civil Aeronautics (DINAC) was the institution in charge of carrying out the Call for Tenders No. 405,291 under the category of Cleaning Services, Maintenance and Minor and Major Repairs of Installations, Machinery and Vehiclesby the type of Direct Contracting procedure.
The aforementioned institution awarded 28 items.
Cleaning of Condensers and Evaporators for G. 590,000.
Disassembly and Cleaning of the Turbine for G. 353,000.
Adjustments and Testing of the Control System for G. 393,000.
Provision and Assembly of Return Grilles for G. 448,000.
Provision and Assembly of Injection Grids for G. 448,000.
Provision and Installation of 30A Compressor Contactor for G. 243,000.
Provision and Installation of 15 A Contactor for Evaporator and Condenser Fan for G. 243,000.
Provision and Installation of Sequence and Phase Failure Voltmeter Relay for G. 377,000.
Provision and Installation of Control Display, Including Thermostat.- for G. 511,000.
Provision and Installation of Circuit Breaker Tm 3X80 A for G. 780,000.
Provision and Installation of Timer from 0 to 5 Minutes. for G. 161,000.
Charge of R22 Refrigerant Gas per G. 132,000.
Charge of Unfreezing Oil for Use With R22 per G. 101,000.
Provision and Installation of Condenser Fan Blade for G. 590,000.
Provision and Assembly of Scroll Type Compressor of 7.5 Hp (90,000 Btu/H) for G. 13,322,000.
Supply and Installation of Belt for G. 172,000.
Provision and Assembly of 4 Hp Fan Motor for Condenser for G. 4,300,000.
Provision and Assembly of 4 Hp Fan Motor for Evaporator for G. 4,787,000.
Provision and Installation of Digital Thermostat (Full Gauge Type) for G. 400,000.
Provision and Installation of Dual Pressure Switch for Gas R22 for G. 592,000.
Supply and Installation of Liquid Line Filter for Gas R22 for G. 380,000.
Provision and Installation of Air Filters According to the Existing Model for G. 168,000.
Provision and Installation of Bearings for the Electric Motor of the Evaporator Fan for G. 266,000.
Provision and Installation of Bearings for the Condenser Fan Electric Motor for G. 338,000.
Provision and Installation of 32Mm Pvc Pipe for Drainage for G. 92,000.
Rewinding of Electric Motor of the Capacitor With Adaptation of Ruleman by G. 1,016,000.
Rewinding of the Evaporator Electric Motor for G. 1,016,000.
Provision and Assembly of Electric Power Line With Workshop Type Conductors of 4X25 Mm2 for G. 168,000.
The aforementioned firm has Ricardo González as its legal representative.
Three more companies appeared at the call: Ite Sociedad Anónima, Jorge Claudio Maure Navarro and Pascual Torres Nuñez.
The absence of Cuba as a collaborating country of USA in the annual report of its strategy to confront drug trafficking It would be supported for political reasons, according to assessments by
Last Sunday, approximately thirty community members, including men and women, carried out a collective task to clear the spring and irrigation canals that supply water to the Cochangará annex, in the district
He Major General Ramón Antonio Guzmán Peralta was placed by the President of the Republic, Luis Abinader, in an honorable situation of retirement after the cessation of his functions as general director
Cuba’s ambassador to Brazil, Adolfo Curbelo Castellanos, classifies the United States’ (US) economic and energy blockade against the Caribbean island as a “genocidal policy” that seeks to deprive the population of their