The company AES Dominican reported on Sunday afternoon that the plant is already AES Andrés He restored entered into combined cycle, “after the effects caused by the presence of sargasso in the area “.
The plant, located in the Boca Chica municipality, Santo Domingo province, was out of service since Saturday. Contributes to Interconnected national electrical system (Seni) 319 megawatts Natural gas.
“The generator went into operation at 9:00 am today, taking up its normal operations after Implementation of cleaning protocols and intensive water monitoring, which guarantees the stability and security of the service, “the company said in a press release.
Measures to mitigate sargasso
The same way, AES Dominican He stressed that it maintains permanent measures to mitigate the effects of this Natural phenomenonthat every year occurs with greater intensity in the region, ensuring the continuity and reliability of the national electrical system.
The company thanked the authorities of the electricity sector and the Navy of the Dominican Republic by the support provided in the cleaning and withdrawal process of the sargassocontributing to normalization of the service.
