Three ferrous runners in Caribbean and Pacific advance with rehabilitation and connection plans for loading and foreign trade in Colombia.
He Ministry of Transportation and the National Infrastructure Agency (ANI) They reported on the progress of ferrous projects considered of national importance. These plans seek to consolidate the iron mode as a strategic part of the country connectivityprioritizing logistics and cargo corridors that strengthen competitiveness.
Among the outstanding projects is the Central iron corridor, which connects the gold with Chiriguaná. This layout is key to the mobilization of load to the Caribbean coast and integration with ports, becoming an axis for intermodal transport.
It may interest you: ELECTIONS 2026: President Petro Lanza Hard Answer to Miguel Uribe Londoño
Loading …
The initiative contemplates the rehabilitation of infrastructure and the modernization of services to ensure efficiency in rail traffic.
Another priority project is the Atlantic iron corridor, which covers the Chiriguaná – Santa Marta journey. Its importance lies in the direct connection with the port of the capital of Magdalena, one of the strategic points for foreign trade.
The consolidation plan Includes improvements in the technical conditions of the road iron and the implementation of operations that allow optimizing transport times.
The Pacific Fréro Corridorwhich includes the journey between Buenaventura and La Tebaida. This corridor seeks to boost load output by the main port on the Pacific Ocean, thus strengthening the competitiveness of exports and access to international markets.
The works of rehabilitation and operation aim to reactivate a layout that had had low use in recent years.
The document indicates that all These runners are part of the country’s modal and logistics integration strategy. The central objective is to reactivate and consolidate the iron network to complement road transport, reduce logistics costs and offer sustainable alternatives in load mobilization.
The ANI He informed that these projects are executed under rehabilitation, operation and maintenance schemeswith defined deadlines for consolidation.
More news: Three dead and nine wounded after shooting in New York Club related to gang
The goal is to guarantee available iron infrastructure and in adequate technical conditions, allowing its articulation with ports, production centers and logistics platforms.
Together, prioritized ferrous corridors are considered fundamental pieces for the development of foreign trade and the strengthening of intermodal transportation In Colombia.
Source: Integrated information system
