Today: December 6, 2025
February 16, 2025
1 min read

Largest oil platform in Brazil starts pre-salt operation

Largest oil platform in Brazil starts pre-salt operation

The largest production unit of oil in the country to date, Admiral Tamandaré (Buzios 7) began operating in the field of Buzios, in the Santos Basin, about 180 kilometers from the coast of Rio de January, this Saturday (15). The Platform Ship has the capacity to process up to 225,000 barrels of oil and 12 million cubic meters of natural gas per day.Largest oil platform in Brazil starts pre-salt operation

The unit will explore 15 wells, seven oil producers, six water and gas injectors, a convertible (producer and injector) and a gas injector. They will all be interconnected to the platform through an underwater infrastructure.

The field of Buzios is considered one of the most promising points of the so -called Brazilian pre-salt An area of ​​oil reserves formed by a layer of sedimentary rocks and located in ultra -deep waters of the Brazilian coast, between 5,000 and 7,000 meters deep.

In a statement, Petrobras reaffirmed the expectation that the field of Buzios will soon become its largest production field, and could exceed 1.5 million barrels of production per day. “The FPSo Admiral Tamandaré is part of the sixth Buzios production system and will contribute to the field to reach the production of 1 million barrels of oil per day, scheduled for the second half of 2025,” said the company’s president, Magda Chambriard .

The unit was grieved next to SBM Offshore. In addition to presenting production above the average of the industry units – which is around 150 thousand daily oil and compression barrels of 10 million m3 of gas – Admiral Tamandaré has decarbonization technologies, which, according to Petrobras contributes to the reduction of greenhouse gas emissions in the atmosphere. There are also technologies for heat use, which reduce additional energy demand for the unit.

Also in a statement, the Minister of Mines and Energy, Alexandre Silveira, stressed the importance of the unit for the expansion of national production. “The entry into operation of the Almirante Tamandaré FPSO is another important step to strengthen energy production in Brazil. This platform has cutting -edge technology to produce more with less environmental impact, using modern systems to reduce emissions and optimize energy use. This reinforces our commitment to the development of the oil and gas sector on sustainable bases, ”he said.

The start of the operation, this Saturday (15), coincided with the announcement that Petrobras identified New oil reserves in one Poço (9-Biz-99d-RJS) From the western region of Campo de Buzios, drilled at about 1,940 meters deep, from tests performed from 5,600 meters deep.

The beginning of the operation occurred one day after the National Agency of Petroleum, Natural Gas and Biofuels (ANP) granted the missing authorizations for the Buzios shared deposit consortium, formed by Petrobras (operator that owns 88.9% of control about the enterprise), CNOOC (7.34%) and CNPC (3.67%) place the unit to function.

Source link

Latest Posts

They celebrated "Buenos Aires Coffee Day" with a tour of historic bars - Télam
Cum at clita latine. Tation nominavi quo id. An est possit adipiscing, error tation qualisque vel te.

Categories

More than 600,000 people enrolled in the Comptroller's Merit Contest
Previous Story

More than 600,000 people enrolled in the Comptroller’s Merit Contest

President Maduro regrets the death leader Jacobo Torres
Next Story

President Maduro regrets the death leader Jacobo Torres

Latest from Blog

Go toTop