Today: November 21, 2024
November 21, 2024
2 mins read

Murguía neighborhood

Murguía neighborhood

The Municipality works in the streets

The General Directorate of Works has been carrying out an important intervention in the Murguía neighborhood of the city of Melo.

A team of machinery and officials works on preparing streets for bituminous irrigation, building curbs and installing columns for public lighting.

“We are working intensely in various parts of the city. Now we are in Barrio Murguía where the changes have already begun to be noticed. On José Pedro Varela Street, the curb was already made around June 14 and now it is being done from June 14 to José Cúneo Avenue.” reported Fernando Gamarra.

“The streets are being prepared for bituminous irrigation. On Castellanos Street we are disqualifying and preparing for bitumen and curb curb. “On June 14, its entire length will have a curb.” advancement.

“The columns for lighting the Murguía are also coming. “This area will undergo a substantial change that will benefit the residents who live in the area.” he stressed.

WORK IS WORKED IN OTHER POINTS OF THE CAPITAL CITY

Gamarra also listed the urban developments that have occurred throughout the northern area of ​​Melo. “His face has changed. It is looking spectacular, with many streets with asphalt, with new bitumen in many others, with curbs and sidewalks.” he detailed.

“In the last few hours we were meeting with the Mayor and the residents of the Camino Vecinal explaining to them the reason for the delay in channeling heavy traffic through Ejido” held. “We also gave them first-hand the news that we are not going to do what we had planned, which was bituminous irrigation, but rather we are going to tackle the original project. The company is going to start as soon as possible to do the cementing from the Aceguá highway. We already have a team making a curb from Las Tropas towards Camino del Arenal where there will be a roundabout.” he explained.

From Avenida Italia to the roundabout with Camino al Arenal it will be an Avenue with a central flower bed and lighting. From there until Route 8 to Aceguá it will be painted because the width of the road does not allow it.

FINISH PROJECTS THAT ARE IN EXECUTION

“Another of our teams is working in Juana de Ibarbourou, southern zone sector 9, with a very important transformation in road infrastructure” Gamarra considered.

“We also have a team near the Club Charrúa sports complex. There we are making a ditch cordon until Gutiérrez Ruiz. At the same time, the cementing preparation stage is underway on the transversal roads from Saravia to the Aceguá highway.” assured the General Director of Works.

“In a few more days, asphalt will be laid in Saravia from Las Tropas to Reconquista because OSE has not yet released the section between Ejido and Las Tropas” he pointed out.

“The important thing is to close the works that we have open” he emphasized. “The idea is not to stop as long as the weather is good. “We are analyzing the issue of licenses because we must take advantage of the days of stable weather.” he added.

WORKS IN THE MUNICIPALITIES

A meeting is scheduled for today between Gamarra, the Mayor and the Coordinator of Municipalities Virginia Costa to coordinate the works that will be carried out inside the department.

“We are going to have a very busy end to the year in terms of works” said to THE DIARY PROFESSIONAL the General Director of Works of the Yurramendi Administration while closely monitoring the work being carried out in Barrio Murguía at Remigio Castellanos and 14 de Junio ​​streets.

Source link

Latest Posts

They celebrated "Buenos Aires Coffee Day" with a tour of historic bars - Télam
Cum at clita latine. Tation nominavi quo id. An est possit adipiscing, error tation qualisque vel te.

Categories

Foreign Minister Gil: Milei and Meloni met to attack Venezuela
Previous Story

Foreign Minister Gil: Milei and Meloni met to attack Venezuela

Congreso Apicultura de Latinoamérica fue inaugurado en la UASD
Next Story

Latin American Beekeeping Congress was inaugurated at the UASD

Latest from Blog

Sismo en el Oriente de Cuba

Perceptible earthquake in Granma

MIAMI.- The National Center for Seismological Research (Cenais) reported on a earthquake of magnitude 4.0 on the Richter scale that was recorded this Thursday in the province of Granma, in eastern Cuba.
Go toTop