Today: November 22, 2024
November 1, 2024
1 min read

Aqueduct pipe recently inaugurated by Abinader in Pedernales collapses

Colapsa tubería de acueducto recién inaugurado por Abinader en Pedernales

PEDERNALES.- The high pressure line of the aqueduct recently inaugurated by President Luis Abinader suffered a rupture near the landfill, leaving the tourist city under construction in Cabo Rojo without water supply.

The pipe, made of PVC with a diameter of 20 inches and a thickness of about one inch, broke just a week after its inauguration. Although the tourist area of ​​Cabo Rojo is still in the construction phase of hotels, it is currently without drinking water.

You may be interested in reading: Residents in Pedernales have been waiting for the construction of a binational market for 2 years

However, the water extracted from the subsoil has a modern and advanced treatment plant, which, although it has not yet been officially inaugurated, already provides service to more than two thousand workers in hotel construction and the cruise ship dock.

Source link

Latest Posts

They celebrated "Buenos Aires Coffee Day" with a tour of historic bars - Télam
Cum at clita latine. Tation nominavi quo id. An est possit adipiscing, error tation qualisque vel te.

Categories

Electoral law will be enriched in three work tables until December 15
Previous Story

Electoral law will be enriched in three work tables until December 15

ADT wants to close the Clausura by beating Sport Boys
Next Story

ADT wants to close the Clausura by beating Sport Boys

Latest from Blog

Go toTop