The TransMilenio station on Calle 63in Bogotá, will join the stops that have been closed on the Caracas trunk line due to construction work on the first Metro line.
(Read more: ‘Petro has to respect that there is a mayor in Bogotá’: Carlos Fernando Galán)
Operations at this point in the transport system will cease on August 31. However, users will be able to They will have different alternatives to move around through the area without any problems.
Those traveling to and from the Chapinero sector will have 22 trunk routes available as travel options. These will be available at the Flores – Areandina and Calle 57 stations as soon as the service at the Calle 63 stop is suspended.
(Read more: Increased property tax in Cartagena – Barranquilla will be reinvested in the region)
Alternative routes
– Easy route 8 Guatoque – Portal Norte.
– Easy Route 6 Portal 80 – Universities.
– BH13 North Portal – Tunal Portal.
– CF19 Suba Portal – Flags.
– DH20 Portal 80 – Usme Portal.
– BH75 North Portal – Usme Portal.
– AG52 South Portal – Flores.
– AF61 Polo – Portal Américas.
– BJ74 North Portal – Waters.
– BK23 Alcala – El Dorado Portal.
– CH15 Suba Portal – Tunal Portal.
– DJ24 Portal 80 – Universities.
(More news: Bogotá’s economy grows slowly: the poverty challenges that the capital still faces)
Other closures in Caracas
Please note that the District Mobility Secretariat also authorized the Complete closure of the mixed roads on Caracas Avenue between 24th Street and 26th Streetstarting next Monday, August 26 at 10:00 p.m.
Unless there are any changes to the schedule, the closures are expected to last approximately three months.
(More news: Colombia Without Hunger: find out how to know if you are a beneficiary of the program)
PORTFOLIO