Today: December 23, 2024
February 20, 2023
1 min read

They carry out emptying of the road on the main avenue of La Vega

Ejecutan vaciado de calzada en avenida principal de La Vega

The Mayor’s Office of Caracas carried out an emptying of the road on the main avenue, towards La Vega from kilometer 5 of the Pan-American highway, in order to improve road traffic in this populous parish.

The information was disseminated by Mayor A/J Carmen Meléndez, through her social networks, who stressed that dDuring the tour this Sunday, February 19 through Caracas, he inspected the emptying of the roadway of the main avenue in the direction of La Vega, from Kilometer 5 of the Pan-American Highway.

In total, 14 cubic meters were emptied, which is expected to optimize vehicular traffic in the area.

It should be noted that on February 12, 60 tons of asphalt were placed on the old highway that connects Caracas with the Miranda state capital, Los Teques, to meet the requests made through the ComeApp.

The application was created by the Bolivarian Government, as part of the 1×10 of Good Governmentto maintain direct and permanent communication with the people.

VTV/YD/LL



Source link

Latest Posts

They celebrated "Buenos Aires Coffee Day" with a tour of historic bars - Télam
Cum at clita latine. Tation nominavi quo id. An est possit adipiscing, error tation qualisque vel te.

Categories

"The commitment is to always work for a greater redistribution of income"
Previous Story

"The parity negotiation is vigorous and does not require interventions"

President Luis Abinader with the engineers and contractors of the Monte Grande dam
Next Story

Abinader affirms Monte Grande dam would be ready in July

Latest from Blog

Go toTop