Today: November 17, 2024
December 6, 2022
1 min read

The Duarte bridge will be intervened again due to a problem in recently repaired joints

WhatsApp Image 2022 12 05 at 4.42.40 PM

Santo Domingo.- With barely a month to be repaired, several of the joints of the duarte bridge They already show deterioration, which constitutes a construction defect by the contractor firm Proyectos Industriales (PINSA).

The work, which had an investment of around 60 million pesos, according to the Ministry of Public Works (MOPC), was estimated to have a useful life of 20 years.

The joints that have holes in the concrete are those on the east side of the Duarte bridge that connects the National District with the neighboring municipality of Santo Domingo Este in a west-east direction.

In this regard, the MOCP reported this Monday in a statement that Pinsa will proceed to correct the flaws.

He specified that for such purposes, the structure will be completely closed to vehicular traffic next Saturday, December 10, starting at 9:00 p.m. until Sunday until 6:00 p.m.

You may also like: They deliver renovation of the Duarte bridge after more than 3 months

The engineer said that the total closure of the bridge will last until 6:00 pm on Sunday, December 11.

“The joints that were placed on the bridge on the east side, which are the ones that present problems, will be removed and will be placed again, but with different climatic conditions, in addition to the fact that the bridge will be closed,” explained Ramón Gómez, President of Pinsa who spoke in the presence of the Vice Minister of Road Maintenance, Mélito Santana.

Gómez, while lamenting the situation, explained that “this happened because the repair of the bridge continued at the time of the storm, due to the need to finish the project.

“The failures are due to the torrential rains, which greatly affected the setting of the concrete,” he said.

He said the bridge was originally supposed to have been closed completely while resurfacing and resurfacing work took place, but only two lanes were closed while resurfacing and repair work was underway.

According to MOPC data, the Junan Pablo Duarte bridge has a daily traffic flow of 35,500 vehicles between 6:00 in the morning and 8:00 at night.

Duarte Bridge on its opening day after repairs

On July 7, Minister Deligne Ascención announced the work to change the expansion joints in the four lanes of the bridge, beginning on the south side, while in a second stage the lanes on the north side were to continue.

At that time it was said that the work would last 60 days, however, the work lasted three months and 18 days, almost double.

On November 2, Public Works delivered the refurbished Duarte bridge, which, in addition to changing the joints, underwent new asphalt, signposting, and maintenance of its railings.

Source link

Latest Posts

They celebrated "Buenos Aires Coffee Day" with a tour of historic bars - Télam
Cum at clita latine. Tation nominavi quo id. An est possit adipiscing, error tation qualisque vel te.

Categories

Edil Gabbiani proposed to convene the organizations involved to enhance the value of the CYSSA Club
Previous Story

Edil Gabbiani proposed to convene the organizations involved to enhance the value of the CYSSA Club

Pedro Castillo: businesswoman confesses that she paid a bribe of S/ 4 million to Salatiel Marrufo
Next Story

Supervisory Commission summons Salatiel Marrufo on Wednesday, December 7

Latest from Blog

From James to Falcao: "keep scoring more goals"

From James to Falcao: "keep scoring more goals"

After the painful defeat of the Colombian team against Uruguay on date 11 of the South American Qualifiers for the 2026 World Cup, player James Rodríguez remembered forward Falcao García after breaking
World Premature Children's Day

World Premature Children’s Day

Every November 17th the World Day of the Premature Child with the purpose of raising awareness of the adverse situations faced by premature babies, as well as their caregivers, and seeking solutions
Go toTop