Over the course of the night, the DNCP published that Jorge Omar Garcia Rolin was awarded for a total value of G. 266,834,515, and managed to win the tender for the Construction of Cobbled-Type Pavement on Streets, Road to Educational Institutions with the ID 415,739. For this tender, offers began to be received on Wednesday, September 14, 2022.
Municipality of Tomás Romero Pereira was the institution in charge of carrying out the Call for Tenders No. 415,739 under the category of Construction, Restoration, Reconstruction OR Remodeling and Repair of Real Estateby the type of Bid Contest procedure.
The aforementioned institution awarded 36 items.
- Works Sign-Cobblestone Construction Identifier (Juan Pablo Meza Street- Basic School No. 8083 Ciudad Nueva) by G. 1.073.604.
- General Cleaning of the Construction Site (Juan Pablo Meza Street- Basic School No. 8083 Ciudad Nueva) for G. 1,085,600.
- Layout and Work Marking, With Topographic Equipment. (Juan Pablo Meza Street- Basic School No. 8083 Ciudad Nueva) for G. 1,099,200.
- Soil Movement (Profiling) and Box Preparation. (Juan Pablo Meza Street- Basic School No. 8083 Ciudad Nueva) for G. 2,426,400.
- Mechanical Soil Compaction. (Juan Pablo Meza Street- Basic School No. 8083 Ciudad Nueva) for G. 1,388,800.
- Clean Red Earth Mattress for a Stone Seat (Juan Pablo Meza Street- Basic School No. 8083 Ciudad Nueva) for G. 2,801,600.
- Cordón Gutter of H ° (Juan Pablo Meza Street- Basic School No. 8083 Ciudad Nueva) by G. 15.109.200.
- Cordon Escondido de H° (Juan Pablo Meza Street- Basic School No. 8083 Ciudad Nueva) by G. 1,780,320.
- Paving Construction (Juan Pablo Meza Street- Basic School No. 8083 Ciudad Nueva) by G. 25.601.100.
- Paved With Crushed Stone, On Cobbled Pavement (Juan Pablo Meza Street- Basic School No. 8083 Ciudad Nueva) by G. 1,341,900.
- Initial, Daily and Final Compaction (Juan Pablo Meza Street- Basic School No. 8083 Ciudad Nueva) for G. 1,579,200.
- General and Final Cleaning of Works Site (Juan Pablo Meza Street- Basic School No. 8083 Ciudad Nueva) for G. 994,000.
- Sign of Works-Identifier of the Construction of Cobblestones (Calle S/N Between Calle Prof. Marino Arzamendia and Calle del Maestro- Road to the Angel de la Esperanza Inclusion Support Center) by G. 1,073,604.
- General Cleaning of the Construction Site (Calle S/N Between Calle Prof. Marino Arzamendia and Calle del Maestro- Road to the Support Center for the Inclusion Angel de la Esperanza) by G. 2,334,040.
- Layout and Work Marking, With Topographic Equipment. (Calle S/N Between Calle Prof. Marino Arzamendia y del Maestro- Camino al Centro de Apoyo a la Inclusion Angel de la Esperanza) for G. 2,365,000.
- Soil Movement (Profiling) and Box Preparation. Soil Movement (Profiling) and Box Preparation. Soil Movement (Profiling) and Box Preparation. (Calle S/N Between Calle Prof. Marino Arzamendia y del Maestro- On the way to the Angel de la Esperanza Inclusion Support Center) by G. 5,216,760.
- Mechanical Soil Compaction (Calle S/N Between Calle Prof. Marino Arzamendia and Calle del Maestro- Road to the Angel de la Esperanza Inclusion Support Center) by G. 2,985,920.
- Clean Colored Earth Mattress for Stone Seat. (Calle S/N Between Calle Prof. Marino Arzamendia y del Maestro- On the way to the Angel de la Esperanza Inclusion Support Center) by G. 6,023,440.
- Cordon Cuneta de Hº. (Calle S/N Between Calle Prof. Marino Arzamendia y del Maestro- Camino al Centro de Apoyo a la Inclusion Angel de la Esperanza) by G. 31.274.388.
- Hidden Cord of H°. (Calle S/N Between Calle Prof. Marino Arzamendia y del Maestro- On the way to the Angel de la Esperanza Inclusion Support Center) by G. 1,424,224.
- Stone construction. (Calle S/N Between Calle Prof. Marino Arzamendia y del Maestro- On the way to the Angel de la Esperanza Inclusion Support Center) by G. 55,043,870.
- Engraved With Crushed Stone, On Cobbled Pavement. (Calle S/N Between Calle Prof. Marino Arzamendia y del Maestro- On the way to the Angel de la Esperanza Inclusion Support Center) by G. 2,885,085.
- Initial, Daily and Final Compaction. (Calle S/N Between Calle Prof. Marino Arzamendia y del Maestro- On the way to the Angel de la Esperanza Inclusion Support Center) by G. 3,395,280.
- General and Final Cleaning of the Construction Site. (Calle S/N Between Calle Prof. Marino Arzamendia y del Maestro- On the way to the Angel de la Esperanza Inclusion Support Center) by G. 2,137,100.
- Works Poster-Construction Identifier. (Street Evelio Lopez Between the Pioneers and Avda. Tomas Romero Pereira- Road to the Angel of Hope Inclusion Support Center) from Empedrados by G. 1,073,604.
- General Cleaning of the Construction Site. (Evelio Lopez Street Between the Pioneers and Tomas Romero Pereira Avenue- Road to the Angel of Hope Inclusion Support Center) by G. 1,867,232.
- Layout and Work Marking, With Topographic Equipment. (Evelio Lopez Street Between the Pioneers and Tomas Romero Pereira Avenue- Road to the Angel of Hope Inclusion Support Center) for G. 1,892,000.
- Soil Movement (Profiling) and Box Preparation. (Evelio Lopez Street Between Pioneers and Tomas Romero Pereira Avenue- Road to the Angel of Hope Inclusion Support Center) by G. 4,173,408.
- Mechanical Soil Compaction. (Evelio Lopez Street Between the Pioneers and Tomas Romero Pereira Avenue- Road to the Angel of Hope Inclusion Support Center) by G. 2,388,736.
- Clean Red Earth Mattress for Stone Seat (Evelio Lopez Street Between Pioneers and Tomas Romero Pereira Avenue- Road to the Angel of Hope Inclusion Support Center) by G. 4,818,752.
- H ° Gutter Cord. (Evelio Lopez Street Between the Pioneers and Tomas Romero Pereira Avenue- Road to the Angel of Hope Inclusion Support Center) by G. 25,987,824.
- Hidden Cord of H°. (Evelio Lopez Street Between the Pioneers and Tomas Romero Pereira Avenue- Road to the Angel of Hope Inclusion Support Center) by G. 1,424,256.
- Stone construction. (Evelio Lopez Street Between Pioneers and Tomas Romero Pereira Avenue- Road to the Angel of Hope Inclusion Support Center) by G. 44,035,096.
- Engraved With Crushed Stone, On Cobbled Pavement. (Evelio Lopez Street Between the Pioneers and Tomas Romero Pereira Avenue- Road to the Angel of Hope Inclusion Support Center) by G. 2,308,068.
- Initial, Daily and Final Compaction. (Evelio Lopez Street Between the Pioneers and Tomas Romero Pereira Avenue- Road to the Angel of Hope Inclusion Support Center) by G. 2,716,224.
- General and Final Cleaning of the Construction Site (Street Evelio Lopez Between the Pioneros and Avda. Tomas Romero Pereira- Road to the Angel de la Esperanza Inclusion Support Center) for G. 1,709,680.
The aforementioned firm has Jorge Omar García Rolin as its legal representative.
One more company came to the call: Oscar Rodas.
Source: DNCP