Today: September 22, 2024
January 4, 2022
1 min read

Tunnels and elevated elevations will be closed this week for maintenance at the GSD

Cerrarán esta semana túneles y elevados por mantenimiento en el GSD

The Ministry of Public Works and Communications (MOPC) reported that as of Monday 3 and until Saturday 8 of this month of January will carry out maintenance and cleaning work in overpasses, which includes tunnels and elevated, in the Greater Santo Domingo.

The closures They will be in full and will be effective from 10:00 at night until 5:00 in the morning the next day.

They will start this Monday at the elevated of the avenue February 27 and the Juan Bosch bridge.

Tuesday will be closed on Duarte bridge in both directions, the same as the overpasses of Avenida 27 de Febrero with Ortega y Gasset, and with Máximo Gómez. Also, the elevated of the Expreso Quinto Centenario with San Martín, as well as the bridges with Tunti Cáceres and with Peña Batlle.

On Wednesday the closure will correspond to the elevated highway The Americas with José Francisco Peña Gómez street, Jubey highway with Boca Chica (dry bridge), as well as the elevated highway of the Las Américas highway with Puerto Caucedo highway and with streets 7 and 6.

In addition, Las Américas with Route 66 (in both directions), the overpass on the Santo Domingo-Samaná highway; Las Américas highway with Hípica avenue, and the dry bridge of the Las Américas sidewalk.

Next Thursday 6 there will be closure in both directions in the overpasses of Avenida 27 de Febrero with Tiradentes, Lincoln and Churchill; Máximo Gómez with Ovando; Máximo Gómez dry bridge with Reyes Católicos, Juan Carlos bridge, Charles De Gaulle overpass with Ecológica, and the elevated marginal Las Américas with United States avenue.

Friday will be given maintenance to the overpasses 27 de Febrero with Núñez de Cáceres, Doctor Defilló and Carmen Mendoza; in the elevated of the John F. Kennedy with Lope de Vega, Tiradentes and Doctor Defilló, and to the Las Américas tunnel.

On Saturday the overpasses of February 27 with Privada, and Las Américas marginal, the Kennedy elevated with Lincoln and the Las Américas marginal tunnel will be closed.

From Monday to Friday at night they will be carried out works painting of elements in the John F. Kennedy avenue corridor, on the elevated 30 de Mayo and 27 de Febrero freeways, which will cause a partial closure of these roads, while in the long tunnel of the 27 de Febrero with Lincoln and Churchill will perform the replacement of the wiring. Therefore, it will be closed completely from Monday to Thursday at the same time.

In addition, during this week brigades will participate in the collection of solid waste on different roads both at the urban level and in the interior, from 8:00 in the morning to 5:00 in the afternoon, without the need for closure.

Source link

Latest Posts

They celebrated "Buenos Aires Coffee Day" with a tour of historic bars - Télam
Cum at clita latine. Tation nominavi quo id. An est possit adipiscing, error tation qualisque vel te.

Categories

They denounce that Martín Lema will spend $ 4.5 million on cell phones with Mides silver
Previous Story

They denounce that Martín Lema will spend $ 4.5 million on cell phones with Mides silver

Three armed individuals damaged a large erotic huaco in Moche (VIDEO)
Next Story

Three armed individuals damaged a large erotic huaco in Moche (VIDEO)

Latest from Blog

Go toTop